Solar Contractor Insurance by State
South Dakota Solar Contractor Insurance
South Dakota licenses the wiring of a solar system through its electrical contracting law, adopts the National Electrical Code for the whole state, has not confirmed rules for solar sellers, and treats workers’ compensation as an election.
Only an electrical contractor may enter a contract to install electrical wiring in South Dakota, and the State Electrical Commission licenses that work by what it does, with no solar class on its list. Whether the state sets rules of its own for solar sellers or installers is not confirmed at the state level: the solar-specific law found governs land agreements. Wiring is built to the National Electrical Code that the Commission’s rules adopt for the whole state, with room for stricter local requirements. Workers’ compensation is an election, because an employer that comes within the title shall secure payment, and an employer that does not is deemed to have elected not to operate under it.
The answers have edges that a bid should respect. The license turns on who signs the wiring contract, the sales rulebook is an open question, and a compensation election is a different thing from a compulsory duty. The sections below take each in turn, with the source’s own words where they matter and advice for the owner.
The workings of each policy for a solar business anywhere are set out on the solar contractor insurance page and the coverage pages it links to. This page stays with what is particular to South Dakota, whether your business does rooftop installation, runs panel cleaning and maintenance routes or takes on ground-mount and solar farm construction.
A waterfall in which each step takes what the step above leaves for it. At the top, a State Electrical Commission license is needed to plan, lay out, supervise or install electrical wiring, and only an electrical contractor may enter a wiring contract; the narrower electrician license reaches only farm and residential wiring, and no license class is written for solar. Below it, a city may add its own electrician license, but the state license must come first. Next, state rules for solar sellers and installers are not confirmed at the state level; the solar easement and lease law binds the parties to a land agreement, and net metering and interconnection belong to the utility and its regulator. After that, installations are built to the National Electrical Code that the Commission adopts, with room for stricter local requirements. At the bottom, workers’ compensation is an election: an employer that does not secure payment is deemed to have elected not to operate under the title, and coverage comes from an authorized insurer or approved self-insurance, with no state fund. No figures are shown.
The Commission license that decides who may sign a wiring contract
South Dakota licenses electrical wiring through its electrical licensing law and has no solar license; a solar system’s wiring is covered only as electrical wiring. A business that plans, lays out, supervises or installs wiring, apparatus or equipment for electric light, heat or power must hold a license from the State Electrical Commission, and the law names no solar or photovoltaic class.
A solar contractor in South Dakota holds an electrical contractor license from the State Electrical Commission to contract for the wiring of a solar system; the Class B electrician license reaches only farm and residential wiring. An applicant for a contractor license deposits an undertaking and a public liability insurance policy with the Commission, and the coverage must stay in force with certificates of insurance on file at the Commission’s office. A city or other local government may add licensing and requirements of its own.
Authority: SDCL § 36-16-1; § 36-16-2; § 36-16-13; § 36-16-14; § 36-16-20; § 36-16-35; § 9-34-12; ARSD 20:44:21:04
The contracting chapter of the Codified Laws describes the licensed work by its function, not by trade:
“undertakes or offers to undertake with another to plan, lay out, supervise, install, make additions, make alterations, or make repairs, in the installation of wiring, apparatus, or equipment for electric lights, heat, or power, shall be licensed by the State Electrical Commission”
The words do not name solar, and the Commission’s class list has no solar class, so the finding above reaches a solar system through those function words. As advice, treat the conductors, the equipment and the tie-in of any array as covered work until the Commission tells you otherwise in writing.
The sentence that bears hardest on the person who signs the paper is the restriction on contracting:
“No contract, agreement, or understanding with another for the installation of electrical wiring or the installation of electrical parts of other apparatus shall be entered into by anyone not an electrical contractor.”
The restriction is about the contract, so it follows the signature as well as the tools. A business that sells an array and subcontracts the wiring still has to know who signs for the wiring. As advice, settle that before the proposal goes out and write the license holder’s name into it. The State Electrical Commission licenses electrical contractors, Class B electricians and journeyman electricians, requires the undertaking and liability insurance, adopts the National Electrical Code and runs wiring permits and inspections.
A narrower electrician license, the undertaking on file and the city layer
The statute does not give every licensed electrician the same reach. A narrower electrician license exists, and its holder’s contracting authority carries a limit:
“his authority under the contract, undertaking or agreement is limited to the installation of farm electrical wiring, residential electrical wiring”
The sentence continues with the equipment, appliances and apparatus related to that farm and residential wiring. For a solar business, the limit sorts jobs by building type. As advice, sort every job at intake by the building under the array, and match the license of the person who signs to the list the statute prints.
A contractor also has a paper duty beyond the license: the undertaking and liability insurance the Commission requires must stay in force with certificates on file at its office. It is a requirement on the licensed contractor, and it is no substitute for the coverage a solar business carries for its own work. Damage a crew causes to a roof or a building is the subject of the general liability page.
Cities add their own layer, and the statute lets them:
“A municipality may license, tax, and regulate plumbers, electricians, electrical workers, residential contractors and heating, ventilation, and air conditioning contractors.”
The Commission’s rule says how a local card relates to the state license:
“An electrician applying for a license from a municipal government under SDCL 9-34-12 must first possess a state license”
So a city license is built on the state license and does not replace it. Which South Dakota cities use the power is not confirmed here, so the practical step is to ask. As advice:
- Ask the building or permit office where the job sits whether it licenses electricians or residential contractors, and what it wants on file before a permit issues.
- When you subcontract the wiring, collect the state license, and the city license where the city issues them, along with the certificate of insurance before the electrician starts.
A solar statute written for land agreements, and seller rules not confirmed
A South Dakota solar installer qualification or seller registration is not confirmed at the state level. The solar-specific law found governs land agreements rather than equipment sales. A solar easement or solar lease cannot be executed until a waiting period has run after the proposed agreement reaches the property owner, an easement must be written and recorded, and an easement agreement must carry a statement about the holder’s right to mortgage its interest.
The land-agreement law binds the parties to a solar easement or lease, the developer that takes the land rights in a solar farm project, not a contractor that only installs or maintains the equipment. A contractor that also leases land for its own project follows the waiting period, the recording rules and the mortgage statement. Net metering, interconnection and the sale of electricity are matters of the Public Utilities Commission and the electric utility, not of an installer duty; whether another state rule reaches a seller or installer is not confirmed.
Authority: SDCL § 43-13-16.1; § 43-13-17; § 43-13-18; § 43-13-20.3; § 43-13-20.4; ARSD chapter 20:10:36
The solar-specific law found sits in the chapter on easements. It defines a solar easement by its purpose:
“for the purpose of ensuring adequate exposure of a photovoltaic solar power system to the sun, or an agreement to refrain from developing a photovoltaic solar power system”
What the chapter regulates is the agreement between a landowner and whoever takes the land rights. A waiting period comes before signing:
“No wind or solar easement or wind or solar lease may be executed by the parties until at least ten business days after the first proposed easement or lease has been delivered to the property owner.”
Those duties fall on the parties to the land agreement. A contractor that builds a ground-mount project for a developer is not the party the statute addresses, though a contractor that also leases the land for its own project is. As advice, ask a developer client whether the easement or lease was signed and recorded as the chapter requires before you break ground on the strength of it.
Net metering and interconnection are matters for a different office. The South Dakota Public Utilities Commission regulates small generator interconnection and the price paid for excess solar generation for utilities within its jurisdiction, and its solar questions page says plainly:
“South Dakota does not compensate solar generation at a net metered rate.”
Those duties fall on the customer and the utility rather than on an installer. A contractor that prepares the paperwork for a customer is still doing work the customer relies on, and the professional liability page explains how a policy treats an estimate that proves wrong or a form that holds up a project.
The finding stays narrow. It says a state rulebook for solar sellers or installers is not confirmed at the state level. It does not say such a rulebook exists, and it does not say there is none. As advice, write each proposal for a reader who is looking for what you promised, and keep a signed copy of whatever the customer received.
The national code the Commission’s rule applies to every electric installation
South Dakota adopts the National Electrical Code statewide through rules of the State Electrical Commission, which make electric light, power and heating installations in the state conform to it. The Commission’s list of exceptions to the adopted edition leaves the solar photovoltaic article as the edition prints it.
Solar wiring in South Dakota is built to the adopted National Electrical Code and inspected under the State Electrical Commission’s wiring permit and inspection system, and the solar article applies as the adopted edition prints it. A municipality or an electric supplier can enforce stricter requirements of its own, so the permit office and the utility for the job’s location are checked for local additions.
Authority: ARSD 20:44:22:01; ARSD 20:44:14:01(11); SDCL § 36-16-12; § 36-16-27; § 36-16-35
The adopting rule reads:
“Electric light, power, and heating installations in this state shall conform to the National Electrical Code.”
The Commission’s definition rule says which code that means:
“the code published by the National Fire Protection Association (2023 edition, including tentative interim amendments 23-1 through 23-15”
The rule lists exceptions to the edition, and the finding above is that none of them reaches the solar photovoltaic article, so that article applies as the adopted edition prints it. As advice, make sure every crew lead knows which edition the inspector is reading from, because a design that leans on a provision from another edition can fail on the day of inspection.
A state code is not always the last word. The statute lets local bodies and utilities set a tougher bar than the chapter does:
“Nothing in this chapter shall prohibit any municipality, rural electric cooperative, private utility, or political subdivision of the state from making and enforcing more stringent requirements than those set forth in this chapter”
As advice, ask the permit office and the utility serving each site what they add to the state code, and settle it with the inspector before the work starts when a design is near an edge. A fault in finished wiring is a matter for the general liability page.
Compensation as an election the title leaves to the employer
In South Dakota, workers’ compensation coverage is an election an employer makes under the state’s Workers’ Compensation title. The title presumes employers and employees accept it and tells an employer that comes within it to secure payment of compensation, and an employer that fails to do so is deemed to have elected not to operate under the title. Coverage comes from authorized insurers in the open market, or from self-insurance approved by the Department of Labor and Regulation; there is no state fund.
A solar contractor with employees that operates under the title secures compensation with a workers’ compensation policy from an authorized insurer, or qualifies with the Department of Labor and Regulation for a certificate of exemption to self-insure. A principal, intermediate or subcontractor is liable for compensation to an injured employee of a subcontractor on the premises where the contract work is done, to the same extent as the subcontractor’s own employer, so a contractor that hires subcontractors makes sure their employees are covered.
Authority: SDCL § 62-5-1; § 62-5-2; § 62-5-5; § 62-5-7; § 62-3-3; § 62-3-5; § 62-3-10; § 58-20-15
The securing section tells an employer that comes within the title what to do:
“any employer, coming within the compensation provisions of this title, shall secure the payment of compensation to the employer's employees”
The statute does not stop there. The section on failure to secure payment says what an employer has chosen if it does not:
“shall be deemed to have elected not to operate under the provisions of this title”
This page does not state what follows for an employer that operates outside the title. As advice, do not read the election as a permission. Put the question to your agent and your attorney before anyone joins the payroll, and have the answer in writing.
For an employer that secures payment, the statute names its routes. Insurance is a route:
“insuring and keeping insured the payment of the compensation with any stock corporation writing workers' compensation insurance or any mutual employer's liability association authorized to transact the business of workers' compensation insurance in this state”
The other is to carry the burden itself, on proof to the Department of Labor and Regulation, which houses the Electrical Commission and, for workers’ compensation, takes an employer’s proof of solvency for self-insurance and issues the certificate of exemption:
“annually furnishes satisfactory proof to the Department of Labor and Regulation of the employer's solvency and financial ability to pay the compensation required by this title”
A state fund is not among these routes. For a solar business, that leaves a policy placed with an authorized insurer, unless the Department has accepted proof that the business can pay compensation itself.
The subcontractor’s crew on the job, and who answers for it
A solar job can put other people’s crews on the roof: a trenching sub on a ground-mount site, an electrician for the tie-in, a racking crew in a busy season. The statute speaks to that case:
“A principal, intermediate, or subcontractor is liable for compensation to any employee injured while in the employ of any subcontractor and engaged upon the subject matter of the contract, to the same extent as the immediate employer.”
The sentence reaches a contractor that hires subcontractors, and it treats the contractor as standing in for the immediate employer. As advice, settle before the season who on each job is your employee, and collect a certificate of coverage from every subcontractor before its people climb onto an array. How crews are classified, how subcontractors are treated at audit and how a policy follows a crew that travels are set out on the workers’ compensation page. Nothing here reaches past South Dakota’s border; for a job in a neighboring state, check that state’s rules before the crew leaves the yard.
South Dakota is recorded here as a state where comp is not compulsory, with a State Electrical Commission for the license. Whatever the choice on coverage, OSHA’s Fall Prevention Campaign still describes the planning and training that work at height calls for.
Where to take a question about the license, the code, the grid or the comp title
The public bodies behind this page each hold a separate part of the picture. Each link goes to the body’s own site, and each role is given as the source states it:
- State Electrical Commission: licenses electrical contractors, Class B electricians and journeyman electricians, requires the undertaking and liability insurance, adopts the National Electrical Code and runs wiring permits and inspections
- Department of Labor and Regulation: houses the Electrical Commission and, for workers’ compensation, takes an employer’s proof of solvency for self-insurance and issues the certificate of exemption
- South Dakota Public Utilities Commission: regulates small generator interconnection and the price paid for excess solar generation for utilities within its jurisdiction
- South Dakota Legislature: publishes the Codified Laws and the Administrative Rules of South Dakota, including the electricians chapter, the Workers’ Compensation title and the National Electrical Code adoption rule
Any agency that sells you a policy, ours among them, can be looked up on NIPR.com. In an ordinary week, add the permit offices of the cities and counties where your crews work, because the statute lets them ask for more.
The South Dakota counties in each metro card, and a metro centered outside the state
The cards below show the metropolitan areas with a South Dakota county, as the U.S. Census Bureau delineates them, and the South Dakota counties inside each. A metro whose principal city is in South Dakota leads; a card for a metro centered elsewhere closes the list and names only the South Dakota counties.
Sioux Falls, SD-MN
Part of this metro lies outside South Dakota; this card lists its South Dakota counties only: Lincoln County, McCook County, Minnehaha County and Turner County.
Rapid City, SD
Made up of Custer County, Meade County and Pennington County.
Sioux City, IA-NE-SD
Part of this metro lies outside South Dakota; this card lists its South Dakota counties only: Union County.
The Commission’s license and its code reach every county on these cards, so a metro line adds only its counties. The local layer does vary, because a city may license electricians and a utility may ask for more than the state code. As advice, log the county and the city for every job you price, and check that place’s rule before the proposal goes out.
Policies that answer for the wiring contract, the code and the covered payroll
The findings above say where South Dakota’s rules sit. The policies that answer for the work are the ones a solar business carries wherever it works, and each has its own page:
- The license and the electricians you bring in point to general liability, which also takes up finished wiring and damage to the roof or building under the array.
- Estimates and designs a customer relied on, in a state where a seller rulebook is not confirmed, point to professional liability.
- The compensation election and the subcontractor’s crew point to workers’ compensation, placed with an authorized insurer.
- Trucks and trailers that carry modules and racking between the yard and the job point to commercial auto.
- Meters, lifts and stock on the way to a job point to tools and equipment.
Which of those weigh heaviest depends on the work, and the pages on rooftop installation, panel cleaning and maintenance and ground-mount and solar farm construction take each kind of work on its own terms. When you are ready to put the pieces together for South Dakota jobs, a quote request is the place to start.
State rules decide who may do the work and how; the policies decide who pays when something goes wrong.
- A license, registration or certification is a requirement of the state, not insurance.
- Solar sales and installer rules is not confirmed at the state level on this page.
A panel for South Dakota in rows. Each row sets a requirement of the state beside the exposure that requirement leaves open and the coverage line that answers it. License to install: A state electrician license exists; the text read names no solar work. It leaves open damage to the roof, the building or a neighbor’s property from the installation work, which General Liability answers. Solar sales and installer rules: Not confirmed at the state level. No connector is drawn for this row. Electrical code: The state adopts the National Electrical Code statewide. It leaves open a wiring or tie-in fault traced back to the work after the job is done, which General Liability answers. Workers’ compensation: Not required of every employer. It leaves open a crew member hurt on the job, which Workers’ Compensation answers. Notes: A license, registration or certification is a requirement of the state, not insurance. Solar sales and installer rules is not confirmed at the state level on this page. The conclusion reads: State rules decide who may do the work and how; the policies decide who pays when something goes wrong. No figures are shown.
South Dakota coverage, services and state offices
What we insure
Coverage lines
South Dakota solar contractor insurance questions
Our company sells and wires arrays under its own name. Which license lets us sign the wiring contract?
A license from the State Electrical Commission. The contracting chapter says no contract for the installation of electrical wiring may be entered into by anyone who is not an electrical contractor, and the Commission’s license list has no solar class. Decide before the bid whether the business itself holds the contractor license or hires an electrical contractor to sign for the wiring.
A farm customer wants an array on a barn. Can the electrician we employ for farm and residential work sign for it?
The statute limits the narrower electrician license to the installation of farm electrical wiring, residential electrical wiring and the equipment related to them, so a farm building falls inside that limit and a commercial or utility-scale job does not. Settle which license covers each building type before you price, and name the license holder in the proposal.
A city has licensed our electrician. Does that local card stand in for the Commission’s license?
No. A municipality may license electricians, but the Commission’s rule says an electrician applying for a municipal license must already possess a state license. The local card sits on top of the state license rather than replacing it. Ask the permit office in each city what else it requires, and keep both licenses in the job file beside the certificate of insurance.
The only solar statute we found covers land agreements. Does it reach the proposals our sales team writes?
Not as the statute is written. That law binds the parties to a solar easement or lease, which means the landowner and the developer taking the land rights, and it does not name an installer or seller. A state rulebook for solar sellers is not confirmed at the state level. Net metering and interconnection sit with the South Dakota Public Utilities Commission and the utility.
We wire a barn array on a cooperative’s lines. Whose extra requirements can sit on top of the state code?
The statute lets a municipality, rural electric cooperative, private utility or political subdivision make and enforce more stringent requirements than the chapter sets, and the Commission can approve a local inspection system. Ask the permit office and the utility serving the site for their additions before the drawings are final, and write their answers into the job file.
South Dakota presumes employers accept the compensation title. What happens if we never secure payment?
The statute says an employer that fails to comply with the securing sections is deemed to have elected not to operate under the title. This page does not state what follows from that election, so put the question to your agent and your attorney before anyone joins the payroll. Coverage, when you choose it, comes from an authorized insurer or from self-insurance the Department of Labor and Regulation accepts.
A subcontractor’s crew is working on our roof with no coverage of its own. Who answers to an injured worker?
The statute makes a principal, intermediate or subcontractor liable for compensation to an employee injured while employed by a subcontractor and engaged upon the subject matter of the contract, to the same extent as the immediate employer. Collect a certificate of coverage from every subcontractor before its people set foot on an array, and keep it with the contract.
If the state sells no compensation coverage, where does a South Dakota solar employer get it?
From a stock corporation writing workers’ compensation insurance or a mutual employer’s liability association authorized in the state, or through self-insurance, which requires satisfactory proof of solvency to the Department of Labor and Regulation each year. The routes the statute names do not include a state fund. Ask an agency to place the policy, and check its license on NIPR.com before you sign.
This page describes insurance for solar contractors operating in this state. It is general information, not legal advice and not a statement of coverage. Licensing, interconnection and code requirements change; verify current requirements with the agency named before relying on them.