New Mexico Solar Contractor Insurance
New Mexico sends photovoltaic contracting to its state electrical license classes, puts the installer’s license number on a signed disclosure statement in each distributed generation agreement, sets a statewide electrical code as the floor for local codes, and requires comp of licensed contractors.
New Mexico writes solar into its electrical licensing. A permit rule of the Construction Industries Division, New Mexico Regulation and Licensing Department names solar photovoltaic systems, sends anyone bidding or contracting to install such a system to the division’s electrical license classifications, and requires the people doing the installation to hold the division’s journeyman certificates or work as supervised apprentices. The wiring is built to an electrical code the division adopts for the whole state, a floor every city and county must meet. A distributed generation disclosure law puts a signed statement, naming the installer and its state contractor license number, into each sale, lease or financing agreement, commercial installations included. Workers’ compensation is compulsory for every employer doing licensed construction work, and there is no state fund.
Much of that turns on the division’s paper: the license behind the bid and the installers’ certificates come from it, and the license number travels onto the statement a customer signs. The sections below follow those papers in turn, with advice kept apart from what the state requires.
How the policies behave for a solar business anywhere is set out on the solar contractor insurance page and the coverage pages linked from it. Here the subject is New Mexico, whether your crews handle rooftop installation, keep up panel cleaning and maintenance accounts or build ground-mount and solar farm construction projects.
A waterfall read from the top down, each step the next document the state’s rules call for on a solar job. At the top, the business holds a state construction license in the electrical classification that fits the job, because the permit rule names solar photovoltaic systems and the licensing act bars contracting without a license classified for the work. Beneath it, the people doing the installation hold the division’s journeyman certificates or work as apprentices under a certified journeyman, while racking and mounting may go to other licensees whose classification covers that work. The license number then appears on the disclosure statement the buyer, lessee or power purchaser signs, a statement the distributed generation law requires in every financing, sale, lease or power agreement, commercial installations included, though the law does not name solar. The work is permitted and inspected under the electrical code the division adopts for the whole state, a minimum every city and county must meet. After installation, the seller or marketer shows the customer that the permits were obtained and an inspector approved the work. At the bottom, the insurer files the certificate of workers’ compensation coverage with the administration, or the director certifies the employer to carry the risk itself, with no state fund. No figures are shown.
Electrical license classes named in the photovoltaic permit rule
New Mexico licenses solar contractors statewide through the Construction Industries Division of the Regulation and Licensing Department. The division’s permit rule says anyone bidding or contracting to install a solar photovoltaic electric system must hold a division license in the electrical classification that fits the job — residential, commercial and industrial wiring, residential wiring, or distribution and transmission lines — and the people doing the installation must hold journeyman electrical certificates or work as supervised apprentices.
A solar firm that bids or builds photovoltaic work in New Mexico holds a Construction Industries Division license classified for that work, since the Construction Industries Licensing Act bars acting as a contractor without such a license and defines electrical wiring to take in solar generating equipment. A general building license may carry the prime contract or the structural work where the rule allows it, and racking and mounting may be done by any licensee whose classification covers that work.
Authority: NMSA 1978, §§ 60-13-12(A), 60-13-32(A); 14.5.2.8(F) NMAC; 14.6.6.8 NMAC; 14.6.6.10 NMAC
The permit rule states the license requirement plainly, with the division’s own classification symbols:
“Persons bidding or contracting for the installation of a solar PV electric system must possess a valid license issued by the division with the EE-98, EL-1 or ER-1 license classification, as applicable”
That sentence rests on the licensing act, which sets the bar for any contractor in the state:
“No person shall act as a contractor without a license issued by the division classified to cover the type of work to be undertaken.”
The same act’s definition of electrical wiring reaches past the conductors to the equipment that makes the power:
“"electrical wiring" means all wiring, conductors, fixtures, devices, conduits, appliances or other equipment, including generating equipment such as solar electricity generating equipment”
The permit rule ties the class to the job, so the license that fits a house roof may not fit a warehouse. As advice, check your classification against the building and the scope before each bid, and when the work moves into a new kind of project, ask the division in writing whether your class reaches it. How a liability policy answers for damage your crew does to a roof or a neighbor’s property is set out on the general liability page.
Journeyman certificates for the hands on the array
The license belongs to the business. The permit rule then turns to the people who do the installing:
“Persons performing the installation of a solar PV electrical system, or related work, must possess a valid journeyman certificate issued by CID”
An installer without a certificate works as an apprentice under a certified journeyman’s direct supervision, as the finding above records. The structure, though, is left to whichever licensee’s classification covers it:
“Nothing in this section shall be construed to prohibit a properly licensed person from performing work on the solar PV system’s support structures, racking and mounting of panels as long as it is within the scope of the license classification”
So a New Mexico crew divides along the conductors: rails, panels and support structures with a licensee whose class reaches them, the electrical installation with certified journeymen and their apprentices. Advice for keeping that line clean:
- Keep a current roster of every installer’s certificate, and note which apprentices work under which journeyman on each job.
- Tell the crew lead in writing where racking stops and electrical work starts, so a helper does not land a conductor because the journeyman stepped away.
- When you subcontract the racking or a roof reinforcement, ask for the subcontractor’s division license with its certificate of insurance. How an uninsured subcontractor’s crew is treated at audit is explained on the workers’ compensation page.
A signed statement that carries the installer’s license number
New Mexico’s Distributed Generation Disclosure Act requires every agreement to finance, sell or lease a distributed energy generation system, or to sell its power, to include a separate written statement signed by the buyer or lessee — among its items the installer’s state contractor license number, the right to rescind, the system’s design and production assumptions, all fees, the tax incentives used in the price, and who sets interconnection requirements.
Authority: NMSA 1978, §§ 57-31-1 to 57-31-5
The law that governs a solar sale here is not a solar law by name. It is written for distributed energy generation systems, and it does not name solar at all; solar and storage systems alike fall under it. Its central duty reads this way:
“any agreement governing the financing, sale or lease of a distributed energy generation system, or the sale of power to a power purchaser, shall include a written statement”
The duty belongs to the business that sells, which the law defines broadly:
“"seller or marketer" means a person acting through its officers, employees, brokers or agents that markets, sells or solicits the sale or lease of distributed energy generation systems”
The duty falls on the seller or marketer of the system, and the statement must name the business responsible for installing it and its state contractor license. After installation, the seller must show the customer that the required permits were obtained and an authorized inspector approved the work. The Attorney General has published a form statement that satisfies the act. The law speaks of distributed energy generation systems used mainly on site, which takes in solar and storage, not solar alone, and it reaches commercial installations as well as homes.
The item an installer should read closely is the line identifying it:
“the name, address, telephone number, email address and valid state contractor license number of the person responsible for installing the distributed energy generation system;”
The division license, in other words, ends up on paper the customer signs. If your firm installs systems another company sells, the seller writes your number in, and a stale number is still your name on the page. As advice, send every seller your license details in writing and tell it the day anything changes.
The statement does not have to be drafted from scratch. The New Mexico Department of Justice, the attorney general’s office, which issues the form disclosure statement under the distributed generation disclosure law and adopts its rules, put a final form in the state register:
“is publishing a final form Distributed Generation Disclosure Statement that may be used to provide the disclosures required by the Distributed Generation Disclosure Act”
The headline above also lists the system’s design and production assumptions among the items, which is what a disappointed customer compares against the meter. The professional liability page explains how a policy treats an estimate that falls short when nothing was damaged.
Commercial buyers, power purchasers and the proof after installation
A firm that works only on business roofs might assume a disclosure law is written for households. This law’s list of required items speaks to the commercial case directly:
“in the case of a commercial installation, a change in assessed property taxes in the event of a purchase of a distributed energy generation system;”
The statement belongs in a power sale agreement as well, so selling a customer the output of an array sits under the same rule as a cash purchase. The law’s customer is the buyer, the lessee or the power purchaser.
The duty does not end at signing. Once the system is in, the seller or marketer owes the customer proof, and the list opens with this:
“all permits required for the installation or any modification of the distributed energy generation system were obtained prior to installation; and”
That proof comes from the installer’s file. As advice, close every job with a packet holding the permit, the inspector’s approval, a copy of the signed statement and the certificate numbers of the people who did the electrical work. Where another business sold the system, agree in the subcontract who sends the proof and by when, and keep the packet for as long as the system stays in place, since a complaint about output or a leak can arrive long after the crew has moved on.
The division’s electrical code as a floor under local codes
New Mexico adopts the National Electrical Code statewide through the Construction Industries Division’s rule 14.10.4 NMAC, the New Mexico Electrical Code, which the division lists among its current electrical codes. The rule amends no part of the code’s solar photovoltaic article.
Solar wiring in New Mexico is built to the division’s adopted electrical code, which every city and county must treat as a minimum, and the solar article applies as the adopted edition prints it. The division’s permit rule adds the solar-specific steps: plans to the electrical authority, an electrical permit to a licensed electrical contractor, and engineering review where roof loads require it.
Authority: 14.10.4 NMAC; NMSA 1978, § 60-13-44(F)
The adopting rule names its source code by reference:
“This rule adopts by reference the 2020 National Electrical Code (NEC), as amended by this rule.”
The licensing act then makes the code a minimum that no city or county may go below:
“All political subdivisions of the state are subject to the provisions of codes adopted and approved under the Construction Industries Licensing Act. Such codes constitute a minimum requirement for the codes of political subdivisions.”
None of the adopting rule’s changes to the national code sits in the solar photovoltaic article, so that article applies as the adopted edition prints it; the solar-specific steps come from the permit rule instead. As advice, ask the office that takes your plans whether it adds anything of its own, since a local code may go above the state’s but not below it, and keep the engineer’s structural letter in the job file whenever the roof called for it. How a liability policy treats a wiring fault traced back to finished work is set out on the general liability page.
Comp for every licensed contractor, whatever the headcount
Workers’ compensation is compulsory in New Mexico, and for construction it reaches every employer whatever its size: the Workers’ Compensation Act applies generally above a headcount it states, but it applies to all employers engaged in work the Construction Industries Licensing Act requires a license for. The employer insures through an authorized insurer, which files the certificate with the Workers’ Compensation Administration, or proves to the administration’s director that it is solvent enough to carry the risk itself. There is no state fund.
A licensed solar contractor with employees carries a workers’ compensation policy from an authorized insurer, or qualifies with the administration to pay benefits itself; the Construction Industries Division requires coverage for every licensed entity. The state has a statute-created insurer that sells this coverage, but its statute makes it a mutual insurance company, not a state fund, and coverage comes from the market.
Authority: NMSA 1978, § 52-1-6(A); NMSA 1978, § 52-1-4(A); NMSA 1978, §§ 52-9-4, 52-9-13, 52-9-21
The act’s application section adds this after its general headcount rule:
“provided that act shall apply to all employers engaged in activities required to be licensed under the provisions of the Construction Industries Licensing Act”
The certificate of coverage filed with the New Mexico Workers’ Compensation Administration must come from an authorized insurer:
“The required certificate must be provided by an authorized insurer as defined in Section 59A-1-8 NMSA 1978.”
The alternative is a certificate from the administration’s director:
“In case any employer is able to show to the satisfaction of the director that he is financially solvent and that providing insurance coverage is unnecessary, the director shall issue him a certificate to that effect”
The legislature also created an insurer to write this line. Its statute gives it a legal form that is not a state fund:
“The company shall be organized as a domestic mutual insurance company”
“The company shall not be considered a state agency for any purpose.”
For a solar business, the choice is a policy from the market, where that company sells alongside other insurers, or the director’s certificate to carry the risk itself. As advice, place the policy before any employee starts, and collect a current certificate from every subcontractor before its crew sets foot on a roof. How crews are classified is set out on the workers’ compensation page. Nothing here reaches past the state line; for a job in a neighboring state, check that state’s rules.
The Construction Industries Division and the New Mexico Workers’ Compensation Administration are among the bodies listed below. On the federal side, OSHA’s Fall Prevention Campaign names ladders, scaffolds and roofs as the places falls happen in construction.
New Mexico offices that license, inspect and enforce
The New Mexico Office of Superintendent of Insurance is the state’s insurance regulator. An agency that sells you a policy, ours included, can be looked up on NIPR.com.
The public bodies behind the findings on this page, with each role as the record states it:
- Construction Industries Division, New Mexico Regulation and Licensing Department: licenses contractors and certifies journeymen, issues construction permits and inspects work, and issues the state’s electrical code and the solar photovoltaic permit rule
- New Mexico Workers’ Compensation Administration: workers’ compensation administration, employer compliance and self-insurance certificates
- New Mexico Department of Justice: the attorney general’s office, which issues the form disclosure statement under the distributed generation disclosure law and adopts its rules
Missing from the list on purpose: a license class written for solar photovoltaic contracting, which the division’s classification rule does not carry, and a state workers’ compensation fund.
Metro markets and their New Mexico counties
The cards below follow the metropolitan areas that take in New Mexico counties, as the U.S. Census Bureau delineates them, with the New Mexico counties each metro includes.
Albuquerque, NM
Counties in this metro: Bernalillo County, Sandoval County, Torrance County and Valencia County.
Las Cruces, NM
Counties in this metro: Doña Ana County.
Santa Fe, NM
Counties in this metro: Santa Fe County.
Farmington, NM
Counties in this metro: San Juan County.
The division’s license and the electrical code apply statewide, so the credentials your crews hold do not change from metro to metro. As advice, note the county and the city on every job you price, and confirm before the bid which office will take the plans and send the inspector, and whether it asks for anything beyond the state code.
Pairing each New Mexico paper with a policy
Each paper this page follows has a policy question behind it, answered on the coverage pages:
- The division license and the racking subcontractors working beside your journeymen point to general liability, which also takes up finished wiring and the roof under the array.
- The design and production assumptions on the disclosure statement point to professional liability.
- The comp certificate the insurer files points to workers’ compensation.
- Trucks and trailers moving modules, racking and crews across long distances between jobs point to commercial auto.
- Meters, lifts and materials on the way to the site point to tools and equipment.
- Commercial and power purchase contracts that ask for limits above the primary layer point to umbrella liability.
The weight of each depends on the work, and the pages on rooftop installation, panel cleaning and maintenance and ground-mount and solar farm construction take each kind on its own terms. When the papers for your New Mexico jobs are in order, a quote request is the next step.
State rules decide who may do the work and how; the policies decide who pays when something goes wrong.
- A license, registration or certification is a requirement of the state, not insurance.
A panel for New Mexico in rows. Each row sets a requirement of the state beside the exposure that requirement leaves open and the coverage line that answers it. License to install: A state license reaches solar installation. It leaves open damage to the roof, the building or a neighbor’s property from the installation work, which General Liability answers. Solar sales and installer rules: The state sets its own rules for solar sellers, installers or providers. It leaves open a design, sizing or output estimate the customer relied on that turns out wrong, which Professional Liability answers. Electrical code: The state adopts the National Electrical Code statewide. It leaves open a wiring or tie-in fault traced back to the work after the job is done, which General Liability answers. Workers’ compensation: Required for covered employers, bought in the open market. It leaves open a crew member hurt on the job, which Workers’ Compensation answers. Notes: A license, registration or certification is a requirement of the state, not insurance. The conclusion reads: State rules decide who may do the work and how; the policies decide who pays when something goes wrong. No figures are shown.
New Mexico coverage, services and state offices
What we insure
Coverage lines
New Mexico solar contractor insurance questions
Our company holds a general building license. Can we contract for a photovoltaic job on it alone?
Not for the electrical installation. The permit rule of the Construction Industries Division, New Mexico Regulation and Licensing Department sends anyone bidding or contracting to install a solar photovoltaic system to its electrical classifications. A general building license may carry the prime contract or the structural work only where the rule allows it, and the wiring stays with the electrical classes. Ask the division which classification your scope needs before you bid.
Can our racking crew set rails and mount panels without journeyman electrical certificates?
The permit rule says it does not stop a properly licensed person from working on support structures, racking and the mounting of panels within the scope of that person’s license classification. The electrical installation is different: the people doing it hold journeyman certificates or work as apprentices under a certified journeyman’s direct supervision. As advice, draw that line in writing on every job so nobody crosses it by habit.
We sell arrays to businesses, not households. Does the New Mexico disclosure statement still apply?
Yes, as the law reads. It covers any agreement to finance, sell or lease a distributed energy generation system, or to sell its power, and among its required items is a change in assessed property taxes in the case of a commercial installation. The law speaks of distributed generation rather than solar by name, so read it as written for your commercial contracts too.
Another company sells the systems and we only install them. Does our name end up on its paperwork?
It does. The written statement must give the name, contact details and valid state contractor license number of the business responsible for installing the system, and after installation the seller or marketer must show the customer the permits and an approved inspection. As advice, send each seller your license details in writing, tell it when anything changes, and hand over the permit and inspection papers promptly.
Can a city or county in New Mexico let our wiring follow an older or looser code than the state’s?
No. The Construction Industries Licensing Act makes codes adopted under it a minimum for the codes of every political subdivision, and the Construction Industries Division, New Mexico Regulation and Licensing Department adopts the electrical code your wiring is built to. A local office may still have its own paperwork and inspection scheduling, so ask the office that takes your plans what it expects before the job is priced.
Does the size of our payroll decide whether New Mexico requires workers’ compensation of us?
Not for construction work. The Workers’ Compensation Act’s general rule turns on a headcount it states, but the act applies to every employer engaged in work the Construction Industries Licensing Act requires a license for, and the New Mexico Workers’ Compensation Administration lists licensed contractors among those who need coverage. Put a policy in place before anyone you hire climbs onto an array, and keep the certificate where the crew lead can reach it.
New Mexico has a comp insurer the legislature created. Is that a state fund we have to use?
No. The state has no workers’ compensation fund. The statute-created insurer is organized as a mutual insurance company and is not a state agency for any purpose, so it sells coverage in the market like any authorized insurer. An employer chooses an authorized insurer, or qualifies with the administration’s director to carry the risk itself, and the choice of insurer is yours to make.
This page describes insurance for solar contractors operating in this state. It is general information, not legal advice and not a statement of coverage. Licensing, interconnection and code requirements change; verify current requirements with the agency named before relying on them.