North Dakota Solar Contractor Insurance
North Dakota licenses solar wiring through its State Electrical Board, licenses the contracting business separately, holds the work to a statewide electrical code, routes workers’ compensation through a state fund, and has not confirmed a state rulebook for solar sellers.
North Dakota has no solar-specific license, so the license that reaches an array’s wiring is the electrician license the North Dakota State Electrical Board issues, and a contract to install wiring may be entered only by a master or power limited electrician. The North Dakota Secretary of State licenses the contracting business on a separate track. The wiring is built to the National Electrical Code through the Board’s own wiring standards, and a city may add stricter requirements only for board-licensed individuals. A state rulebook for solar sellers and installers is not confirmed at the state level. And workers’ compensation is monopolistic: a covered employer secures it only through the state fund that North Dakota Workforce Safety and Insurance administers, with no private-market route and no self-insurance route.
The pieces connect tightly. The contractor license application asks for a statement from the fund that coverage is secured, and the Board that licenses the electricians also inspects what they build. The sections below follow each finding with the source’s own words where they matter, and with advice for the owner.
How the policies themselves work for a solar business anywhere is laid out on the solar contractor insurance page and the coverage pages it links to. This page keeps to what is particular to North Dakota, whether your business does rooftop installation, runs panel cleaning and maintenance routes or takes on ground-mount and solar farm construction.
A top-to-bottom flow that follows a North Dakota solar job. It starts at the state fund, because workers’ compensation is monopolistic and the contractor license application asks for a statement from the fund that coverage is secured. Next comes the Secretary of State’s contractor license for the business. Then the sales side: a state rule for solar sellers and installers is not confirmed at the state level, and the provisions read do not reach the contractor. Then the wiring contract, which only a master or power limited electrician may enter. The wiring is built to the National Electrical Code through the State Electrical Board’s wiring standards, and the flow ends at inspection, where the Board has jurisdiction over all electrical installations and a city may inspect inside its limits. No figures are shown.
The wiring contract that only a master or power limited electrician may sign
North Dakota requires a state electrical license for electrical wiring work, and the text read names no solar work. The State Electrical Board licenses master, journeyman, class B and power limited electricians, and a contract to install electrical wiring may be entered only by a licensed master or power limited electrician. The Secretary of State separately licenses the contracting business. North Dakota has no solar-specific license.
A solar contractor in North Dakota holds a contractor license from the Secretary of State for the business, has a licensed master or power limited electrician enter the installation contract, and has licensed electricians or registered apprentices under direct supervision do the wiring. The State Electrical Board inspects the installation, and the contractor gives the building permit office its license number.
Authority: NDCC 43-09-09, 43-09-10, 43-09-20, 43-09-22; NDCC 43-07-01, 43-07-02, 43-07-04, 43-07-24; NDAC 24.1-03-01-02, 24.1-03-01-09
The Century Code begins with a prohibition, and its verbs cover more than the installation itself:
“A person may not undertake or plan to undertake with another person to plan, lay out, supervise, install, make additions, make alterations, or make repairs, in the installation of wiring, apparatus, or equipment for electric light, heat, or power”
Planning, laying out and supervising sit beside installing, adding, altering and repairing, so a business that designs or directs an array’s wiring is inside the sentence even when its own crew never lands a conductor. As advice, treat the design file and the field direction as electrical work in this state, and put them under a licensed electrician.
The statute’s next section lists the classes of electricians the Board may license:
“The classes of electricians who may be licensed under section 43-09-09 are:”
The finding above names them, and no class among them is a solar class. The contract rule is narrower than the license list. The Board’s contracting guidelines page restates it this way:
“may not be entered by anyone other than a master electrician or power limited electrician.”
That sentence governs the contract for the wiring, and it sorts the license holders. An owner, a salesperson or a project manager who holds neither license cannot be the signer. As advice, decide before the bid which licensed master or power limited electrician will enter the wiring contract, and name that person in the proposal.
The Board’s rules put the crew on the licensed electrician’s account:
“It is the responsibility of the master, class B, or power limited electrician to ensure all individuals who are or will be performing electrical or power limited work for that contractor either be licensed electricians or registered apprentices with the board.”
As advice, keep a roster for every job that lists each person doing wiring as either a licensed electrician or a registered apprentice, with the license or registration beside the name.
A last point concerns work that is not installation. The statute is written about wiring, apparatus and equipment for electric light, heat or power, and nothing on this page says the electrical license reaches panel cleaning or maintenance that touches no wiring, or that it stops short of that work. That question is open here. As advice, if your business runs panel cleaning and maintenance routes, describe to the North Dakota State Electrical Board in writing exactly what your technicians touch on a visit, and keep the answer with the service contract. Whether a city or county licenses solar contractors on top of the state licenses is likewise not confirmed here, so ask the building office where the array goes up.
The Secretary of State’s contractor license and the coverage statement its application asks for
The license for the business sits with a different office. The North Dakota Secretary of State licenses contractors as registrar under the contractors chapter. The contractors chapter opens with its own prohibition:
“A person may not engage in the business nor act in the capacity of a contractor within this state”
The sentence goes on to set a dollar threshold per job, which this page does not restate; read it in the statute before assuming a small job falls below it. The license is not a solar credential, and it does not replace the electrician license on the wiring. The application ties it to the comp file:
“the contractor shall submit a statement from North Dakota workforce safety and insurance that the contractor has secured workforce safety and insurance coverage satisfactory to workforce safety and insurance.”
That sentence puts the state fund in the middle of the licensing process. A business with no coverage in place has nothing to submit. As advice, apply to the fund for coverage before the contractor application is filed, so that the statement arrives while the rest of the file is still being assembled rather than after it.
Small power producers, solar decommissioning and a seller rule not confirmed at the state level
A North Dakota solar consumer rule for sellers and installers is not confirmed at the state level. The provisions read do not reach the contractor: the Public Service Commission’s small power production rule governs sales and purchases between qualifying facilities and electric utilities, including net energy billing, and the Century Code lets the Commission adopt decommissioning rules for commercial solar energy conversion facilities. Those provisions set no disclosure, contract or qualification duties for the firm that sells or installs a system, and the rest of the Century Code is not confirmed.
A solar contractor in North Dakota meets the state obligations confirmed here through the electrical and contractor licenses. The utility rules shape how a customer’s system is interconnected and credited, which a contractor coordinates with the utility, but the provisions read impose no duty on the contractor; whether another state rule does is not confirmed.
Authority: NDAC 69-09-07-02, 69-09-07-09; NDCC 49-02-27
The solar-related provisions behind this finding are addressed to others. The North Dakota Public Service Commission’s small power production chapter opens by saying who it regulates:
“This chapter applies to the regulation of sales and purchases between qualifying facilities and electric utilities.”
The parties are the utility and the qualifying facility, not the firm that builds the facility. A contractor coordinates with the utility on how a customer’s system is interconnected and credited, but the chapter puts its duties on the utility and the facility. The Century Code adds a rulemaking clause for the end of a commercial facility’s life:
“The commission may adopt rules governing the decommissioning of commercial solar energy conversion facilities.”
The clause is permissive, since the Commission may adopt rules, and it concerns decommissioning commercial facilities rather than the proposal a seller hands a customer. The finding is narrow. It says that a rule for sellers and installers is not confirmed at the state level, and that the provisions read do not reach the contractor. It does not say such a rule exists, and it does not say the question is closed.
A seller in that position can do the customer’s protecting itself. As advice, build each proposal on some habits:
- State how the output estimate was produced and what it assumes about shading, orientation and equipment, so a shortfall can be traced to a stated assumption rather than to a vague promise.
- List every cost the customer will bear, including those that arrive after installation, and describe in plain words what your business does and what the customer, the utility or another party does.
If a customer relies on an estimate that turns out wrong and nothing is damaged, the claim that follows is a professional liability question rather than a general liability claim, and that page sets out how such a policy responds.
The Board’s wiring standards, the national code they apply and who inspects the job
North Dakota adopts the National Electrical Code statewide through the State Electrical Board’s wiring standards, and the Board’s executive director administers the edition the rule names. The Board has jurisdiction over and provides inspection for all electrical installations, and a city may add stricter requirements that apply only to board-licensed electricians.
Solar wiring in North Dakota is built to the National Electrical Code edition the Board’s rule names, with the Board’s wiring standards applied on top where they are more restrictive, and the Board’s inspectors or an inspector a city appoints inspect it. The Board’s special-permission process lets the executive director modify or waive a requirement in writing before the work begins.
Authority: NDAC 24.1-02-01-02(3); NDAC 24.1-02-01-03(1); NDCC 43-09-21; NDCC 43-09-22
The adoption is made through the Board’s rules. Its section on powers and duties says that the executive director, under the direction of the board,
“shall administer laws, rules, and wiring standards of this state, the electrical requirements of the NFPA 70 2026 edition, National Electrical Code (first version, printed in 2025)”
The state standards sit on top of the national code, so they can run past it. Where the Board’s requirements differ from or conflict with the named code, the statement of policy in the same rules says which prevail:
“the more restrictive requirements are the minimum.”
As advice, a design should be drawn to the national code and then checked against the Board’s own wiring standards for anything stricter. The finding above says the executive director may modify or waive a requirement in writing before the work begins, which is the route for a design that needs it. A photovoltaic amendment to the code is not confirmed; ask the Board whether any provision it applies to arrays differs from the named edition.
The Century Code gives the national codes a legal weight of their own:
“The regulations in the national electrical code and the national electrical safety code as approved by the American national standards institute are prima facie evidence of these approved methods.”
The same section addresses what a city may add:
“Although a city may make more stringent requirements by ordinance, application of the ordinance must be limited to individuals licensed by the board under this chapter.”
The limit follows the people who hold a board license. A stricter city ordinance reaches the licensed electricians on your crew, so confirm with the city building office whether it has one before the drawings are final. As advice, keep the drawings, the equipment listings and the inspector’s sign-off together, because a fault traced back to the work years later is judged against what the code required on the day the job was built.
The Board is also the inspector. The inspection section gives it jurisdiction and a duty:
“The board has jurisdiction over and shall provide inspection for all electrical installations.”
And the section lets the city take a part of that task inside its borders:
“A city may make provisions for inspection of all electrical and power limited systems installed within the corporate limits of the city.”
So on a job inside a city the inspector may be the Board’s or the city’s, and outside any city’s limits the Board’s jurisdiction stands on its own. As advice, ask the permitting office at the start of the job who will inspect, and schedule the visit around that answer. A fault in completed wiring that comes to light later is a general liability matter, and a clean inspection record helps whoever has to answer it.
A fund every covered employer pays into, and the statute’s own words for it
Workers’ compensation in North Dakota is monopolistic. A covered employer secures it only through the state fund that Workforce Safety and Insurance administers; the private insurance market does not write it, and the statute provides no self-insurance route.
A solar contractor with employees applies for coverage with Workforce Safety and Insurance before it employs anyone in a hazardous employment and pays premium into the fund. The Secretary of State’s contractor license application asks for a statement from the same body that coverage is secured.
Authority: NDCC 65-04-04(1); NDCC 65-04-33(1); NDCC 65-01-02; NDCC 65-02-01; NDCC 65-04-30; NDCC 43-07-04(1)
The statute’s name for the body is the one this page uses: North Dakota Workforce Safety and Insurance. The Century Code defines the organization by that short name:
“workforce safety and insurance, or the director, or any department head, assistant, or employee of workforce safety and insurance designated by the director”
The premium duty is stated in the payment section:
“Each employer subject to this title shall pay into the fund the amount of premium and assessment determined by the organization.”
Notice who sets the number. The organization determines the premium and assessment, and the employer pays them into the fund. A solar business therefore has no market of competing quotes to shop, and the statute provides no self-insurance route.
The duty that comes before the payroll is stated in the section on failing to secure coverage:
“An employer may not employ any person, or receive the fruits of the labor of any person, in a hazardous employment as defined in this title, without first applying for workforce safety and insurance coverage for the protection of employees”
The sentence does not wait for a claim. It bars the employment itself until the application is made, so the fund is dealt with on the day a hire is planned, not the day someone is hurt.
Getting each crew onto the fund ahead of the day it climbs a roof
The fund is run as a public function, and the title shows where it sits in state government. The director is appointed by the governor:
“the governor shall appoint a director of workforce safety and insurance who shall serve at the pleasure of the governor.”
And the money is held by a state officer:
“The state treasurer is the custodian of the fund”
Those words describe an administration of government rather than a competitor in a market. The consequence for a solar business is practical. A rate is not negotiated among carriers here, and the coverage statement a license application asks for comes from the fund. What remains is accuracy and discipline:
- Describe the work to the fund as it is done, including roof crews, ground crews and service technicians, so that the classification matches the payroll.
- Settle before the season who on each job is an employee, and collect a certificate of coverage from every subcontractor before its people climb onto an array.
How roof crews, ground crews and service technicians are classified, how subcontractors are treated at audit and how a policy follows a crew that travels are questions set out on the workers’ compensation page. Read it knowing that in North Dakota the buying step runs through the fund. Nothing on this page reaches past North Dakota’s border; for a job in a neighboring state, check that state’s rules before the crew leaves the yard.
North Dakota puts its comp through a named state fund, North Dakota Workforce Safety & Insurance, listed below. Before a crew climbs, it is worth reading OSHA’s Fall Prevention Campaign as well, since it covers planning, equipment and training for work at height.
The Board, the Secretary of State, the fund and the Commission: who keeps which file
The public bodies behind this page each hold a separate part of the picture. Each link goes to the body’s own page or file, and each role is stated plainly:
- North Dakota State Electrical Board: licenses master, journeyman, class B and power limited electricians, adopts the wiring standards that apply the National Electrical Code, and inspects electrical installations
- North Dakota Secretary of State: licenses contractors as registrar under the contractors chapter
- North Dakota Workforce Safety & Insurance: administers the state fund for workers’ compensation and issues the coverage statement the contractor license application asks for
- North Dakota Public Service Commission: regulates sales and purchases between small power producers and electric utilities, including net energy billing
- North Dakota Legislative Branch: publishes the North Dakota Century Code and the North Dakota Administrative Code
The sellers of insurance are the exception to that division. Any producer firm that sells you a policy, ours among them, can be looked up on NIPR.com. Workers’ compensation is bought through the fund rather than through a producer, so the license check applies to the firm that places the rest of your program.
Metro cards for areas that cross the state line and areas that stay within it
The cards below show the largest metropolitan areas with a principal city in North Dakota, as the U.S. Census Bureau delineates them, and the North Dakota counties inside each.
Fargo, ND-MN
Part of this metro lies outside North Dakota; this card lists its North Dakota counties only: Cass County.
Bismarck, ND
Made up of Burleigh County, Morton County and Oliver County.
Grand Forks, ND-MN
Part of this metro lies outside North Dakota; this card lists its North Dakota counties only: Grand Forks County.
Minot, ND
Made up of McHenry County, Renville County and Ward County.
The state licenses, the wiring standards and the fund are statewide, so a metro line adds only its counties. The city line still matters for inspection and for any stricter ordinance, as quoted above. As advice, log the county and the city for every job you price.
Which coverage page picks up the wiring contract, the fund and the inspection
The findings above say where North Dakota’s rules sit. The policies that answer for the work are those a solar business carries wherever it works, and each has its own page:
- The electrician license, the wiring contract and the inspection point to general liability, which also takes up finished wiring and damage to the roof or building under the array.
- Estimates and designs a customer relied on, in a state where a seller rule is not confirmed, point to professional liability.
- The state fund and the coverage statement on the contractor application point to workers’ compensation.
- Trucks and trailers that carry modules and racking between the yard and the job point to commercial auto.
- Meters, lifts and stock on the way to a job point to tools and equipment.
- Contracts that ask for limits above the primary layer point to umbrella liability.
Which of those weigh heaviest depends on the work, and the pages on rooftop installation, panel cleaning and maintenance and ground-mount and solar farm construction take each kind of work on its own terms. When you are ready to put the pieces together for North Dakota jobs, a quote request is the place to start.
State rules decide who may do the work and how; the policies decide who pays when something goes wrong.
- A license, registration or certification is a requirement of the state, not insurance.
- Solar sales and installer rules is not confirmed at the state level on this page.
- In this state, workers’ comp comes from the state fund; we place the rest of your coverage.
A panel for North Dakota in rows. Each row sets a requirement of the state beside the exposure that requirement leaves open and the coverage line that answers it. License to install: A state electrician license exists; the text read names no solar work. It leaves open damage to the roof, the building or a neighbor’s property from the installation work, which General Liability answers. Solar sales and installer rules: Not confirmed at the state level. No connector is drawn for this row. Electrical code: The state adopts the National Electrical Code statewide. It leaves open a wiring or tie-in fault traced back to the work after the job is done, which General Liability answers. Workers’ compensation: Bought only from the state fund. No connector is drawn for this row. Notes: A license, registration or certification is a requirement of the state, not insurance. Solar sales and installer rules is not confirmed at the state level on this page. In this state, workers’ comp comes from the state fund; we place the rest of your coverage. The conclusion reads: State rules decide who may do the work and how; the policies decide who pays when something goes wrong. No figures are shown.
Nearby states we also write
North Dakota coverage, services and state offices
What we insure
Coverage lines
North Dakota solar contractor insurance questions
Who in our company is allowed to sign the contract for the wiring on a North Dakota array?
Only a master electrician or a power limited electrician, according to the North Dakota State Electrical Board’s contracting guidelines, which restate the Century Code. A salesperson, project manager or owner without one of those licenses cannot be the signer. If your company holds neither license, line up a licensed electrician before the proposal goes out, and name that person in it.
We hold the Secretary of State’s contractor license. Does that cover our wiring crew too?
No. The North Dakota Secretary of State licenses the contracting business, and the North Dakota State Electrical Board separately licenses the electricians who do the wiring. They are separate licenses issued by separate offices, and holding the contractor license does not make anyone on the crew an electrician. Keep the business license on file with your permits, and keep each electrician’s license beside it.
Our maintenance route only washes and inspects panels. Does the electrical license apply to those visits?
This page does not say that it does, and it does not say that it stops short of that work. North Dakota has no solar-specific license, and the electrical statute is written about wiring, apparatus and equipment. Put the scope of the route to the North Dakota State Electrical Board in writing, describe exactly what your people touch, and file the answer with the service contract.
A competitor says a private carrier will write comp for a North Dakota crew. Is that right?
The statute says otherwise. North Dakota’s regime is monopolistic: a covered employer secures workers’ compensation only through the state fund that North Dakota Workforce Safety and Insurance administers, and the private insurance market does not write it. Before you rely on a quote from anyone else, ask the seller to show you the statute that lets a private policy satisfy the duty to cover your crew.
We have the balance sheet to pay injured workers ourselves. Does North Dakota let us skip the premium?
The finding on this page is that the statute provides no self-insurance route. The sections that say how an employer secures compensation name the fund, and they have the employer pay premium and assessment into it. However strong your books are, plan on premium. Put your effort into describing your crews to the fund accurately so the payroll is classified the way the work is done.
Why does the contractor license application ask for something from North Dakota Workforce Safety and Insurance?
The Century Code says the contractor shall submit a statement from the fund that it has secured coverage satisfactory to the fund. The application therefore carries the fund’s word on coverage, along with a certificate of liability insurance. As advice, apply for coverage before you file the contractor application, so the statement is in hand and the filing does not sit waiting for it.
A city we bid in wants a stricter wiring rule than the state’s. Does that rule apply to our crew?
A city may make more stringent requirements by ordinance, but the Century Code limits the ordinance to individuals licensed by the North Dakota State Electrical Board. In practice the stricter rule follows your licensed electricians, not your business as such. Ask the city building office for its ordinance before you price the job, and confirm that each electrician on the crew holds the Board’s license.
Our reps want a state form to hand customers. Is there a North Dakota solar sales rule?
A seller or installer rule is not confirmed at the state level. The provisions read are the North Dakota Public Service Commission’s small power production rule, which governs sales between qualifying facilities and utilities, and a decommissioning authority, and neither sets duties for the firm that sells or installs a system. Until that changes, write your own disclosure into each proposal and keep a signed copy.
This page describes insurance for solar contractors operating in this state. It is general information, not legal advice and not a statement of coverage. Licensing, interconnection and code requirements change; verify current requirements with the agency named before relying on them.
Get a quote for your North Dakota solar contracting business
Tell us who holds the master or power limited license on your crews, whether you install, service or build arrays, and the payroll you will bring to the fund, and we will build the rest of the program around those answers.