Solar Contractor Insurance by State

Kentucky Solar Contractor Insurance

Kentucky licenses the wiring side of a solar job statewide and overrides local electrical ordinances, adopts the National Electrical Code through its building and residential codes, has not confirmed a rulebook for solar sellers, and makes workers’ compensation compulsory.

Installers in fall-protection harnesses and safety lines work among solar panels on a low-slope metal roof, one carrying a hand tool.

Kentucky licenses the wiring side of a solar job for the whole Commonwealth, and it does so through an electrical license: the licensing law does not name solar, so a contractor who puts modules on a roof still needs the state electrical contractor license, or a licensed electrician on site, wherever the work reaches the wiring. That state license overrides every city and county electrical licensing ordinance. Wiring is built to the National Electrical Code through the Department of Housing, Buildings and Construction’s building and residential codes, whether the state sets rules for solar sellers is not confirmed at the state level, and workers’ compensation is compulsory for covered employers, bought from an authorized insurer, including the insurer the Legislature created, or replaced by proof to the commissioner that the employer can pay directly.

The license finding rests on a definition of electrical work rather than on any mention of solar. General contractors are not licensed by the state, though some local governments license them. The consumer-rules question is open rather than answered, and the insurer the Legislature created is a public body with a corporate form, not a fund the employer must use. The sections below take these findings in turn, with the statute’s own words where they matter and advice for the owner.

How the policies behind a solar program work anywhere is laid out on the solar contractor insurance page and the coverage pages it links to. This page keeps to what is particular to Kentucky, whether your business does rooftop installation, handles panel cleaning and maintenance routes or takes on ground-mount and solar farm construction.

Kentucky’s housing and construction department at the center of a solar contractor’s wiring obligations: the licenses it issues, the local rules it overrides, the codes it adopts and the inspectors it certifies.

A relationship diagram with the state housing and construction department at the center. From the department, labeled lines run to each part of the wiring side of a solar job: it issues electrical contractor, master electrician and electrician licenses, and a person without the matching license may not do that work unless a licensed electrician directly supervises on site; it creates no solar or limited class, because the licensing law does not name solar; it sets aside local ordinances that license electricians, master electricians and electrical contractors; it adopts the building code and the residential code through which the National Electrical Code applies statewide, with the solar article applying as the adopted edition prints it; it certifies the electrical inspectors who check the wiring against that code; and the electrical contractor license it issues asks for proof of compliance with the workers’ compensation law. No figures are shown.

A state electrical license that sets aside every local electrical ordinance

Kentucky licenses electrical work statewide. The Department of Housing, Buildings and Construction issues electrical contractor, master electrician and electrician licenses, and a person without the matching license may not do that work unless a licensed electrician or master electrician directly supervises on site. The Act does not name solar; its definition of electrical work is the wiring and equipment that carry electricity, and it creates no solar or limited class.

A solar contractor in Kentucky holds the state electrical contractor license for the wiring side of a job, and the contractor employs a full-time master electrician unless the contractor holds that license personally. Local building departments issue an electrical permit only on proof of that license or work for a licensed contractor, and the state license overrides any city or county electrical licensing. General contractors are not licensed by the state, but some local governments, such as Bowling Green with Warren County, license them.

Authority: KRS 227A.020(4), (6); KRS 227A.010(3)–(4); KRS 227.480(2)

The bar on unlicensed work sits in the licensing law itself. A person who is not licensed as an electrical contractor, electrician or master electrician

“shall not engage in any activities or perform any of the duties usually performed by an electrical contractor, electrician, or master electrician unless the unlicensed person is under the direct supervision of a licensed electrician or master electrician”

The same law says what its licensing sections do to an ordinance a city or county has written about electricians. They

“shall supersede all ordinances or regulations regulating electricians, master electricians, and electrical contractors of any city, county, urban-county, charter county, or consolidated local government.”

A local building office keeps the permit counter, and the permit statute sets a condition on it. A local government

“shall not issue a permit unless the applicant submits proof of being licensed as an electrical contractor under KRS Chapter 227A or of acting on behalf of a licensed electrical contractor.”

Read together, those sections put the state license in front of the permit. A contractor who intends to wire a tie-in does not win the permit by holding a city license, because the state has displaced the city’s electrician licensing; the proof the office asks for is the state license, or the license of the contractor the applicant works for.

As advice, settle before the bid who on the job holds the state license, and write that name into the proposal.

  • If your business holds the electrical contractor license, confirm that it is current before each permit application, since the permit office will ask for it.
  • If it does not, name the licensed electrical contractor you act for, and keep the written arrangement in the job file.
  • When you subcontract the tie-in, ask for the license along with the certificate of insurance.

How a liability policy treats the electricians you bring in and damage your crews cause on a roof or in a building is set out on the general liability page.

The definition of electrical work, and the master electrician behind the license

The licensing law never uses the word solar. What it defines is electrical work, in these words:

“pertains to the installation, alteration, or repair of wires and conduits for the purpose of transmitting electricity, and the installation of fixtures and equipment in connection therewith;”

An array’s conduit, its conductors, the equipment that converts and disconnects, and the tie-in to a building’s wiring all fit that sentence. The law also sets a condition on who stands behind a contractor’s license:

“If the electrical contractor is not a master electrician, the electrical contractor shall employ at least one (1) full-time master electrician”

The Department of Housing, Buildings and Construction issues the licenses, and the licensing law creates no solar or limited class beneath them. A solar business therefore enters the licensing system through the same electrical classes as any other contractor that wires a building.

The text does not say where mounting stops and wiring begins. Treat that as a question to put to the Department, in writing, before a crew starts work on a roof you have not wired before, and file the reply with the proposal. Do not assume that a job described as racking work stays clear of the electrical license.

General contractors licensed town by town rather than by the Commonwealth

The state license is electrical. As the finding above records, general contractors are not licensed by the state, but some local governments license them. The Bowling Green-Warren County contractors licensing board shows what that looks like: the joint city and county board requires a license of any person engaging in the business of a general contractor or a specialty contractor within its area, and asks an applicant for proof of construction liability insurance and of compliance with the state’s unemployment insurance and workers’ compensation laws. The board’s own FAQ answers who must hold a license this way:

“Any person engaging in the business of a general contractor or a specialty contractor within Bowling Green-Warren County.”

That rule belongs to that local board, and this page does not claim that other places follow it. As advice, treat a local contractor license as a question for every county and city where a bid goes out. Ask whether the place licenses general or specialty contractors, what it wants on file and when the license lapses, and keep a register of what each place has issued your business.

The board described above asks an applicant for proof of liability insurance and of compliance with the compensation laws, so have those certificates ready before any application. The general liability and workers’ compensation pages explain what those policies cover.

Net metering written for the supplier, and a seller rulebook not confirmed

Whether Kentucky sets its own rules for solar sellers, installers or providers is not confirmed at the state level.

Kentucky’s net metering law governs how a retail electric supplier credits a customer-owned generating facility, including solar; it is a rule between the customer and the supplier, and it places no registration or disclosure duty on the contractor who installs the system.

Authority: KRS 278.465; KRS 278.466

The net metering sections are worth reading for who they bind. The statute directs the supplier:

“Each retail electric supplier shall make net metering available to any eligible customer-generator that the supplier currently serves or solicits for service.”

The same sections tie the customer’s equipment to technical standards, in words that reach the National Electrical Code:

“Electric generating systems and interconnecting equipment used by eligible customer-generators shall meet all applicable safety and power quality standards established by the National Electrical Code (NEC), Institute of Electrical and Electronics Engineers (IEEE), and accredited testing laboratories such as Underwriters Laboratories.”

Those are rules for the customer and the supplier. They do not register an installer, license a seller or call for a disclosure in a sales proposal, and the page does not claim that they do. The Kentucky Public Service Commission is the utility regulator: sets the net metering compensation rate and tariffs, which fall on the customer and the supplier.

Because the state-level answer on seller rules is not confirmed, a careful proposal does the work a rule might otherwise do. As advice, say how the output estimate was produced and what it assumes, list every cost the customer will pay, state who files the utility paperwork, and have the customer sign a page that says so. If an estimate falls short and the customer relies on it, the professional liability page sets out how a policy treats a claim where nothing was damaged.

A contractor that prepares an interconnection application for a customer is doing work the customer depends on. Check each form before it goes in, and keep a copy of everything submitted.

A statewide code carried by a building code and a residential code

Kentucky adopts the National Electrical Code statewide through the Department of Housing, Buildings and Construction’s building and residential codes, and the edition now enforced is the edition the Department’s regulations name. The adopted codes amend no part of the solar photovoltaic article that was found.

Solar wiring on a building in Kentucky is built to the adopted National Electrical Code, inspected by a certified electrical inspector of the Department or of the local government, and the solar article applies as the adopted edition prints it.

Authority: KRS 227.480(4); KRS 198B.050(2); 815 KAR 7:120; 815 KAR 7:125; 815 KAR 35:020

The adoption starts with the statute on electrical permits, which ties the standards of the Uniform State Building Code to the national code. Those standards

“shall have as a minimum standard the requirements of the National Electrical Code, which may include Kentucky amendments.”

The adopted codes then put that national code to work. The Kentucky Building Code, as adopted by the Department, says:

“The provisions of NFPA 70 shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings, and appurtenances thereto.”

The Kentucky Residential Code says, of electrical systems:

“The electrical system shall be installed in compliance with NFPA 70 as adopted by the Commonwealth of Kentucky.”

The commercial code’s introduction explains how far local governments may depart from it:

“The Kentucky Building Code is a “mini/maxi” code, meaning that it is a statewide, uniform, mandatory building code and local governments shall not adopt or enforce any other building code governing commercial construction.”

The adopted codes amend no part of the solar photovoltaic article that was found, so that article applies as the adopted edition prints it, and the wiring is inspected by a certified electrical inspector of the Department or of the local government. As advice, give each crew lead the edition the inspector will read from, and ask the permit office which code covers a given building before the drawings are final.

How a liability policy treats a fault in completed wiring that comes to light after the job is explained on the general liability page.

Compulsory comp, and a public-body insurer that competes to write it

Workers’ compensation is compulsory in Kentucky: any person with employees subject to the chapter, other than a person engaged solely in agriculture, is an employer the Act requires to comply. The employer either insures with a corporation, association or organization authorized to write the coverage in Kentucky or proves to the commissioner that it can pay compensation directly. A statute-created insurer competes in the voluntary market and serves as the insurer of last resort; it is described by function here, not named.

A solar contractor with employees carries a workers’ compensation policy from an authorized insurer, including the statute-created insurer, or qualifies with the commissioner to pay compensation directly. The electrical contractor license requires proof of compliance with workers’ compensation law, and a building permit is issued only on an affidavit that the contractors and subcontractors on the job comply with it.

Authority: KRS 342.630(1); KRS 342.340(1); KRS 342.803; KRS 342.801(2); KRS 342.839(4); KRS 227A.060(1)(c); KRS 198B.060(10)(a)

The Workers’ Compensation Act defines the employers it reaches. Its list of employers required to comply begins this way:

“Any person, other than one engaged solely in agriculture, that has in this state one (1) or more employees subject to this chapter.”

An employer that falls inside it must insure or prove it can pay. The statute gives the employer a choice of routes, and in its words the employer may:

“Insure and keep insured its liability for compensation in some corporation, association, or organization authorized to transact the business of workers' compensation insurance in this state; or”

The other route, in the statute’s next words, reads:

“Furnish to the commissioner satisfactory proof of its financial ability to pay directly the compensation in the amount and manner and when due as provided in this chapter.”

Among the insurers authorized to write the coverage is an insurer the Legislature created for the purpose. This page describes it by what it does and does not name it. The statute that creates it says the insurer was

“created as a nonprofit, independent, self-supporting de jure municipal corporation and political subdivision of the Commonwealth which shall be a public body corporate and politic to insure employers in the Commonwealth for workers' compensation”

and says of its work:

“The authority shall provide coverage and issue policies as an insurer in the voluntary market and as an insurer of last resort.”

A policy from that insurer is therefore among the choices on the open market, and it is also a place to turn when the voluntary market will not write the business. As advice, when your agent presents the options, ask which insurers are quoting and confirm that each is authorized to write workers’ compensation in Kentucky.

Other Kentucky statutes carry comp proof into the paperwork of a job. The electrical contractor license statute lists this among its requirements:

“Has submitted proof that he or she has complied with workers' compensation and unemployment insurance laws and administrative regulations”

The statute on building permits bars a permit for building, construction and related activity

“unless the person shall assure, by affidavit, that all contractors and subcontractors employed, or that will be employed, on activity covered by the permit shall be in compliance with Kentucky requirements for workers' compensation insurance according to KRS Chapter 342”

A lapse in coverage can therefore stop a permit as well as expose a payroll. As advice, collect a certificate of coverage from every subcontractor before its people set foot on an array, and settle before the season who on each job is your employee. How roof crews, ground crews and service technicians are classified, how subcontractors are treated at audit and how a policy follows a crew that travels are set out on the workers’ compensation page. Nothing on this page reaches past Kentucky’s border; for a job in a neighboring state, check that state’s rules.

Kentucky’s Department of Workers’ Claims is listed below, and the state uses an electrical license. For crews on roofs, OSHA’s Fall Prevention Campaign is a federal checklist of three steps: plan, provide, train.

The departments and commissions that hold each Kentucky rule

The Department of Insurance is the state’s insurance regulator. Any agency that sells you a policy, this agency among them, can be looked up on NIPR.com.

The other public bodies behind this page each hold a separate part of the picture. Each link goes to the body’s own site or to the chapter of the Revised Statutes that names it:

In an ordinary week the offices that matter to a crew are the local building and permit departments where the work sits. They are the counter at which the state license, the comp proof and the adopted code all meet the job.

Where Kentucky crews will bid: the metro cards and their counties

The cards below show the largest metropolitan areas with a principal city in Kentucky, as the U.S. Census Bureau delineates them, and the Kentucky counties inside each.

Louisville/Jefferson County, KY-IN

Part of this metro lies outside Kentucky; this card lists its Kentucky counties only: Bullitt County, Henry County, Jefferson County, Meade County, Nelson County, Oldham County, Shelby County and Spencer County.

Lexington-Fayette, KY

Made up of Bourbon County, Clark County, Fayette County, Jessamine County, Scott County and Woodford County.

Huntington-Ashland, WV-KY-OH

Part of this metro lies outside Kentucky; this card lists its Kentucky counties only: Boyd County, Carter County, Greenup County and Lawrence County.

Bowling Green, KY

Made up of Allen County, Butler County, Edmonson County and Warren County.

Elizabethtown, KY

Made up of Hardin County and Larue County.

Owensboro, KY

Made up of Daviess County and McLean County.

The state license, the comp requirement and the adopted code are the same wherever in Kentucky the job sits. What changes from county to county is the permit counter and, in some places, a local contractor license. As advice, log the county and the city for every job you price, ask that place whether it licenses general or specialty contractors, and do not assume that an approval in a metro’s principal city carries into the counties around it.

From the electrical license to the policies behind a Kentucky crew

The findings above say where Kentucky’s rules sit. The policies that answer for the work are the ones a solar business carries wherever it works, and each has its own page:

  • The electrical license and the electricians you bring in lead to general liability, which also takes up finished wiring and damage to the roof or building under the array.
  • An output estimate the customer relied on leads to professional liability.
  • The compulsory comp duty, and the proof a license and a permit ask for, lead to workers’ compensation.
  • Trucks and trailers that carry modules and racking between the yard and the job lead to commercial auto.
  • Your own gear on its way to the roof leads to tools and equipment.
  • Contracts that ask for limits above the primary layer lead to umbrella liability.

Which of those weigh heaviest depends on the work, and the pages on rooftop installation, panel cleaning and maintenance and ground-mount and solar farm construction take each kind of work on its own terms. When you are ready to put the pieces together for Kentucky jobs, a quote request is the place to start.

Kentucky: what the state sets for solar contractors, what each rule leaves open, and the coverage page that discusses it.
License to install A state electrician license exists; the text read names no solar work
Damage to the roof, the building or a neighbor’s property from the installation work General Liability
Solar sales and installer rules Not confirmed at the state level
A design, sizing or output estimate the customer relied on that turns out wrong
Electrical code The state adopts the National Electrical Code statewide
A wiring or tie-in fault traced back to the work after the job is done General Liability
Workers’ compensation Required for covered employers, bought in the open market
A crew member hurt on the job Workers’ Compensation

State rules decide who may do the work and how; the policies decide who pays when something goes wrong.

  • A license, registration or certification is a requirement of the state, not insurance.
  • Solar sales and installer rules is not confirmed at the state level on this page.

A panel for Kentucky in rows. Each row sets a requirement of the state beside the exposure that requirement leaves open and the coverage line that answers it. License to install: A state electrician license exists; the text read names no solar work. It leaves open damage to the roof, the building or a neighbor’s property from the installation work, which General Liability answers. Solar sales and installer rules: Not confirmed at the state level. No connector is drawn for this row. Electrical code: The state adopts the National Electrical Code statewide. It leaves open a wiring or tie-in fault traced back to the work after the job is done, which General Liability answers. Workers’ compensation: Required for covered employers, bought in the open market. It leaves open a crew member hurt on the job, which Workers’ Compensation answers. Notes: A license, registration or certification is a requirement of the state, not insurance. Solar sales and installer rules is not confirmed at the state level on this page. The conclusion reads: State rules decide who may do the work and how; the policies decide who pays when something goes wrong. No figures are shown.

Kentucky solar contractor insurance questions

Our crew only mounts racking and modules. Does the Kentucky electrical license still matter on that job?

It matters wherever the work reaches wiring. The licensing law bars an unlicensed person from the duties an electrical contractor, electrician or master electrician usually performs, unless a licensed electrician or master electrician directly supervises on site. It does not name solar, so the text does not say where mounting ends and wiring begins. Ask the Department of Housing, Buildings and Construction before you price the job.

A city on our route licenses its own electricians. Does that ordinance still bind us?

The state law supersedes ordinances or regulations that regulate electricians, master electricians and electrical contractors, so a local electrician license does not replace the state license. A local office can still issue permits, but it may issue an electrical permit only on proof of the state license or of acting for a licensed electrical contractor. Bring that proof to the counter.

Does the Commonwealth license general contractors the way it licenses electricians?

No state general contractor license appears in the building law’s licensing sections, and general contractors are licensed locally in some places. The Bowling Green-Warren County contractors licensing board is an example. Ask the building office wherever a job sits whether it licenses general or specialty contractors, and file the answer with the bid.

Our utility offers net metering. Does the state make an installer register or file anything for it?

Whether Kentucky sets its own rules for solar sellers or installers is not confirmed at the state level. The net metering sections are a rule between the customer and the retail electric supplier, and they place no registration or disclosure duty on the contractor. The Kentucky Public Service Commission sets the compensation rate. Check every interconnection form before the customer signs it.

Does a rooftop array on an apartment complex follow a different electrical code than an array on a house?

The state adopts the National Electrical Code through a building code that governs commercial construction and a residential code that governs dwellings, and each makes that national code the installation standard. Which code covers a given building is a question for the permit office, so ask before the drawings are final and keep its answer with the plans.

Can a Kentucky solar company with a payroll pay injured workers directly instead of buying a policy?

Possibly, but not by choice alone. The statute lets an employer furnish satisfactory proof of its financial ability to pay compensation directly to the commissioner of the Department of Workers’ Claims. Otherwise the employer insures with an authorized company, which can include the insurer the Legislature created. Make that choice before anyone on the payroll climbs a ladder.

Will the building office ask about our comp coverage before it releases a permit?

It can. The permit statute bars a building permit unless the person assures, by affidavit, that the contractors and subcontractors on the work comply with the compensation law, and the electrical contractor license itself requires proof of that compliance. Collect a certificate from every subcontractor before the permit application goes in, so the affidavit is true on the day you sign it.

This page describes insurance for solar contractors operating in this state. It is general information, not legal advice and not a statement of coverage. Licensing, interconnection and code requirements change; verify current requirements with the agency named before relying on them.

Get a quote for your Kentucky solar contracting business

Tell us which Kentucky counties your crews work in, who holds the electrical license on each job and whether you wire the tie-in yourselves, and we will build the program around those answers.