Solar Contractor Insurance by State
Idaho Solar Contractor Insurance
Idaho keeps electrical licensing with the state alone and carries its Solar Photovoltaic category inside that license, asks a residential retailer to name the installer, adopts its electrical code by statute, and makes workers’ compensation compulsory.
Idaho licenses the electrical side of solar installation statewide through the Division of Occupational and Professional Licenses, and the license for it is either an electrical contractor license or a limited electrical contractor license in the Solar Photovoltaic category, with no city or county allowed to add a license of its own. There is no stand-alone solar license: the category sits inside the electrical scheme. A contractor registration covers construction work generally and excuses anyone licensed under the electrical chapter, and a public works contractor license applies to public works contracts only. Wiring is built to the Idaho electrical code, the National Electrical Code as the Legislature adopted it with the Idaho Electrical Board’s amendments, and workers’ compensation is compulsory for every employer, bought from an authorized insurer or self-insured with the Idaho Industrial Commission’s approval.
The sale of a residential system adds a duty that falls on the retailer, who hands the buyer a separate disclosure statement naming the installer by its registration number, and this page covers residential systems only on that point. The sections below take each finding in turn.
How the policies themselves work for a solar business anywhere is laid out on the solar contractor insurance page and the coverage pages it links to. This page keeps to what is particular to Idaho, whether your business does rooftop installation, runs panel cleaning and maintenance routes or takes on ground-mount and solar farm construction.
A stack of layers under an Idaho solar job, read from the top down. At the top is the separate written disclosure statement a retailer hands a household buyer, which names the installer by its state contractor registration number and does not reach commercial or utility-scale systems. Beneath it is the public works contractor license, needed only when the contract is a public works contract. Next is the contractor registration, which a person already licensed under the electrical chapter is excused from holding. Below that is the electrical contractor license, or the limited electrical contractor license in the Solar Photovoltaic category, issued by the state alone, so that no city or county may add a license of its own. Under that sits the Idaho electrical code, the National Electrical Code adopted by statute together with the electrical board’s amendments, inspected by the state or by a city or county that runs its own program. At the bottom is compulsory workers’ compensation, secured through an authorized insurer or through the industrial commission’s approval to self-insure. No figures are shown.
The electrical license that carries the Solar Photovoltaic category
Idaho licenses the electrical side of solar installation statewide through the Division of Occupational and Professional Licenses. An electrical contractor license, or a limited electrical contractor license in the Solar Photovoltaic category, is required to install the wiring, the people doing it hold electrician or limited installer licenses, and no city or county may add its own license. A separate contractor registration applies to construction work generally.
A solar contractor in Idaho holds an electrical contractor license, or a limited electrical contractor license in the Solar Photovoltaic category, from the Division of Occupational and Professional Licenses before it installs a rooftop or ground-mounted system, has licensed electricians or limited installers do the wiring, and registers as a contractor with the Idaho Contractors Board unless its electrical license already covers it. A contractor bidding public works also needs the public works contractor license. Because the state licenses exclusively, a city or county cannot require another license for the same electrical work.
Authority: Idaho Code 54-1002; Idaho Code 54-1003A; Idaho Code 54-5204; Idaho Code 54-5205; Idaho Code 54-1902; IDAPA 24.39.10, Section 200
The duty to hold the license is written in the electrical chapter of the Idaho Code, which makes it unlawful for a person or business
“It shall be unlawful for any person, partnership, company, firm, association or corporation to act, or attempt to act, as an electrical contractor or limited electrical contractor in this state”
The chapter does not name solar. It defines the trade by the work, wires and equipment that carry current, and the same section of the Code settles who may regulate the license, in words that leave a city or county no room to add a license of its own:
“shall be within the exclusive jurisdiction of the state pursuant to this chapter and no local jurisdiction shall have the authority to require additional licensure or registration”
The Solar Photovoltaic category comes from the electrical board’s rule, which prints it as a limited category with its scope beside it. The direct-current entry reads:
“Solar Photovoltaic DC Systems: Install, maintain, repair, and replace all electrical equipment, wires, and accessories up to and including the inverter.”
The entry for micro-inverter systems runs up to and including the alternating-current combiner box.
The rule also asks an applicant in the category for photovoltaic installer certification. Notice what the category is and what it is not. It is a limited category of the electrical contractor license, so the people who do the work still hold electrician or limited installer licenses, and nothing in the statute or the rule names solar as work that needs a license outside the electrical scheme.
As advice, put the license on the page for every job. Name the license that covers the firm, name the license that each person on the roof or in the trench holds, and keep copies in the job file. A crew that holds the limited category should read its scope sentence before the bid, because equipment past the inverter or past the combiner box falls outside the words quoted above. The Idaho Electrical Board adopts the amendments to the National Electrical Code and the rules for electrical licenses and limited categories, including the Solar Photovoltaic category.
How a liability policy treats the electricians you subcontract, and damage your crews cause on a roof or in a building, is set out on the general liability page.
A contractor registration that an electrical license excuses, and a public works license for public jobs
The electrical license is not the only state credential in the record. A contractor registration and a public works license also reach a solar business, and each reaches it for a reason that has nothing to do with solar. The Idaho Contractor Registration Act says
“it shall be unlawful for any person to engage in the business of, or hold himself out as, a contractor within this state without being registered as required in this chapter.”
The Act does not require registration of persons licensed under the listed chapters of the Code, and the electrical chapter is among them. The registration is a general construction registration, not a solar credential, and the Idaho Contractors Board administers it. The public works contractor license is a different kind of route. It is written for contracts, not for technology, and the Code opens it this way:
“It shall be unlawful for any person to engage in the business or act in the capacity of a public works contractor within this state without first obtaining and having a license”
The license reaches a solar farm or a rooftop job only when the contract is a public works contract, meaning construction, repair or reconstruction of a public work for the state or a local public body. A private job does not need it. Set side by side, the routes read like this:
- Electrical license. Required for the wiring and equipment that carry current, including the limited category named Solar Photovoltaic. The state alone licenses it.
- Contractor registration. Required of contractors generally. A person licensed under the electrical chapter is not asked for it.
- Public works contractor license. Required only when the contract is a public works contract.
As advice, a firm that builds on private roofs and on public property should check at bid time which of the routes the contract in front of it triggers, and not assume that the license that served the last job serves the next. The ground-mount and solar farm construction page takes the construction side of that work on its own terms.
The residential retailer’s separate statement, and the registration number it asks the installer for
Idaho’s Residential Solar Energy System Disclosure Act, in the state’s commerce and trade title, requires a solar retailer to give a consumer a separate written disclosure statement before a residential solar purchase or lease agreement is signed. The statement names the person expected to install the system and that person’s state contractor registration number, and carries the system design, production, warranty and savings-estimate disclosures the Act lists. The Act reaches only systems for personal, family or household use.
The duty falls on the solar retailer that sells a residential system or owns a system it leases, and the statement it hands the consumer must identify the installer by its state contractor registration number, so an installer working for a retailer should expect to be named in it. Commercial and utility-scale systems are outside the Act in its own words, and the Attorney General and the district court enforce it as they do the state consumer protection act.
Authority: Idaho Code 48-1802; Idaho Code 48-1804; Idaho Code 48-1805; Idaho Code 48-1809
The Act is a disclosure law aimed at the seller. Its opening duty reads:
“Before entering a solar agreement, a solar retailer shall provide to a potential consumer a separate, written disclosure statement”
What the statement must hold is listed in the sections that follow, and an item among them reaches straight into an installer’s paperwork. The statement must carry the
“state contractor registration number of the person who is expected to install the system that is the subject of the solar agreement”
That clause ties the consumer law to the licensing findings above. A firm that installs for a retailer is named on the retailer’s page by the registration number the Act asks for, so the installer should know in advance what will be printed under its name. The Act draws its own edge, and the residential definition includes this condition:
“Generates electricity primarily for on-site consumption for primarily personal, family, or household purposes”
Commercial and utility-scale systems are outside the Act in its own words, so a business that builds only on commercial roofs or open ground does not take on the retailer’s duty. This page covers residential systems only where the Act is concerned.
- If you sell and install. You are the retailer, so the separate written statement is yours to prepare and hand over before the agreement is signed.
- If you only install for another retailer. Your name and registration number go onto its statement. Ask to read the page before it goes to the buyer, and check that the number belongs to your firm.
- If you build only commercial or utility-scale systems. The Act does not reach those sales, and your other findings on this page still apply.
The statement also carries design, production and savings-estimate disclosures. As advice, treat any estimate in a proposal as a statement a buyer will rely on: say how it was produced and what it assumes about shading, orientation and equipment. If an estimate is challenged and nothing was damaged, the professional liability page sets out how a policy treats the claim.
The Idaho electrical code, and whether the state or a local program inspects
Solar wiring in Idaho is built to the Idaho electrical code, the adopted National Electrical Code as the Board amends it. The state inspects unless a city or county that uses the Idaho electrical code as its standard runs its own inspection program, so the inspector can be state or local while the code is the same.
Authority: Idaho Code 54-1001; Idaho Code 54-1001B; IDAPA 24.39.10, Section 600
Idaho adopts its code in the Idaho Code itself, in a section that opens the electrical chapter. The adoption sentence reads:
“The 2023 National Electrical Code, NFPA 70, is hereby adopted by the Idaho legislature.”
The same section names the adopted code, together with the electrical board’s amendments, the Idaho electrical code, and it applies that code to the installations of wires and equipment to convey electric current in the state. The board’s amendments are part of the code, so a designer who reads only the national text has not read the whole thing. The rule amends the rapid shutdown provisions in the photovoltaic article, and an exemption it adds reads:
“Detached structures whose sole purpose is to house PV system equipment shall not be subject to the requirements outlined in article 690.12.”
As advice, hand the designer the board’s amendment list along with the national text, and have the drawings follow the amended code. Whether a newer edition is coming is not confirmed at the state level, and the statute as it is now in effect names the edition inside the quote above.
Inspection is a separate question from which code applies. The state inspects, except in places that run their own program. The Code sets that exception out in terms of cities and counties that
“Within cities or counties that, by ordinance or building code, prescribe the manner in which wires or equipment to convey current and apparatus to be operated by such current shall be installed”
The clause continues with conditions that the Idaho electrical code be used as the standard and that actual inspections be made. The point for a contractor is that the code is the same everywhere and the inspector can be the state’s or a city’s or county’s. As advice, ask the permit office where the job sits who will inspect the work and what the inspector wants on file at rough-in and at final, and settle any doubt about a design with that inspector before the work.
How a liability policy treats a fault in finished wiring that comes to light after the job is explained on the general liability page.
Comp from an authorized insurer or by self-insuring, and the corporate insurer the statute created
Workers’ compensation is compulsory in Idaho. Every employer secures it either by insuring with an insurer the director of the Department of Insurance has authorized to write it, or by obtaining the Industrial Commission’s approval to self-insure. A statute-created fund also writes the coverage, and public employers insure with it unless it refuses the risk.
A solar contractor with employees insures its workers’ compensation with an authorized insurer, or obtains the Industrial Commission’s approval to self-insure. The electrical contractor license asks for proof of workers’ compensation coverage where it applies.
Authority: Idaho Code 72-301(1); Idaho Code 72-901; Idaho Code 54-1003A(1)
The compensation law puts the duty on the employer in a sentence that sets the pattern for everything after it:
“Every employer shall secure the payment of compensation under this law in one (1) of the following ways:”
An employer can meet it with an insurance policy placed with an insurer
“authorized by the director of the department of insurance to transact such insurance”
The alternative is self-insurance, and the statute says of it:
“An employer may become self-insured by obtaining the approval of the industrial commission”
The Legislature also created an insurer for this coverage. It is described in its own section as a body corporate, set up for a stated purpose. The statute says it is created
“for the purpose of insuring employers against liability for compensation under this worker’s compensation law”
The statute then sets the standard it is to meet:
“is run as an efficient insurance company”
The statute describes an insurer, not a state department: a body corporate that insures employers and is run as an insurance company. Public employers insure with it unless it refuses the risk, and as advice a private solar business should treat it as a possible seller among the authorized insurers. As advice, when your agent presents the options, ask which insurers are quoting and confirm that each is authorized to write workers’ compensation in Idaho.
The electrical contractor license asks for proof of workers’ compensation coverage where it applies, so the comp policy and the licensing file belong together. How roof crews, ground crews and service technicians are classified, how subcontractors are treated at audit and how a policy follows a crew that travels are policy questions rather than Idaho questions, set out on the workers’ compensation page. As advice, settle before the season who on each job is your employee, and collect a certificate from every subcontractor before its people set foot on an array. Nothing on this page reaches past Idaho’s border; for a job in a neighboring state, check that state’s rules.
Idaho’s Electrical Board and the Idaho Industrial Commission both appear below. OSHA’s Fall Prevention Campaign brings in the federal side, where ladders, scaffolds and roofs are the places it names.
Boards inside the Division, and the Commission outside it
The Division of Occupational and Professional Licenses licenses electrical contractors, electricians and limited electrical installers, registers contractors, licenses public works contractors, and issues electrical permits and inspections. Any agency that sells you a policy, this agency among them, can be looked up on NIPR.com.
The other public bodies behind this page each hold a separate part of the picture. Each link goes to the body’s own site or to the statutes it works under, and each role is stated in the body’s own terms:
- Idaho Electrical Board: adopts the amendments to the National Electrical Code and the rules for electrical licenses and limited categories, including the Solar Photovoltaic category
- Idaho Contractors Board: administers the contractor registration within the Division of Occupational and Professional Licenses
- Public Works Contractors License Board: administers the public works contractor license
- Idaho Industrial Commission: administers the workers’ compensation law, including approval of self-insured employers
- Idaho State Legislature: publishes the Idaho Code
Absent on purpose: a stand-alone solar license and any city or county electrical license. In an ordinary week the offices that matter are the licensing division that holds your electrical license, the permit and inspection office where the job sits, and the insurer that holds your policy.
Idaho metro areas on the Census list, and the card for a metro that crosses a state line
The cards below show the largest metropolitan areas with a principal city in Idaho, as the U.S. Census Bureau delineates them, and the Idaho counties inside each.
Boise City, ID
Made up of Ada County, Boise County, Canyon County, Gem County and Owyhee County.
Coeur d'Alene, ID
Made up of Kootenai County.
Idaho Falls, ID
Made up of Bonneville County, Butte County and Jefferson County.
Twin Falls, ID
Made up of Jerome County and Twin Falls County.
Pocatello, ID
Made up of Bannock County.
Lewiston, ID-WA
Part of this metro lies outside Idaho; this card lists its Idaho counties only: Nez Perce County.
The electrical license is the state’s alone, so a metro line adds a county list rather than a different license. What changes from county to county is the permit office and, where a city or county runs its own program, the inspector. As advice, log the county and the city for every job you price, check which office takes the application and who inspects before the proposal goes out, and for a job on the metro that crosses the state line, remember that this page speaks only to the Idaho side.
Pairing the Idaho findings with the policy pages
The findings above say where Idaho’s rules sit. The policies that answer for the work are the ones a solar business carries wherever it works, and each has its own page:
- The licensed electrical work and the electricians you bring in point to general liability, which also takes up finished wiring and damage to the roof or building under the array.
- The estimate a residential buyer relies on, and the statement that names the installer, point to professional liability.
- The compulsory comp law points to workers’ compensation, placed with an authorized insurer or approved self-insurance.
- Trucks and trailers that carry modules and racking between the yard and the job point to commercial auto.
- Your own gear and the materials staged for a job point to tools and equipment.
- Contracts that ask for limits above the primary layer, public works contracts among them, point to umbrella liability.
Which of those weigh heaviest depends on the work, and the pages on rooftop installation, panel cleaning and maintenance and ground-mount and solar farm construction take each kind of work on its own terms. When you are ready to put the pieces together for Idaho jobs, a quote request is the place to start.
State rules decide who may do the work and how; the policies decide who pays when something goes wrong.
- A license, registration or certification is a requirement of the state, not insurance.
A panel for Idaho in rows. Each row sets a requirement of the state beside the exposure that requirement leaves open and the coverage line that answers it. License to install: A state license reaches solar installation. It leaves open damage to the roof, the building or a neighbor’s property from the installation work, which General Liability answers. Solar sales and installer rules: The state sets its own rules for solar sellers, installers or providers. It leaves open a design, sizing or output estimate the customer relied on that turns out wrong, which Professional Liability answers. Electrical code: The state adopts the National Electrical Code statewide. It leaves open a wiring or tie-in fault traced back to the work after the job is done, which General Liability answers. Workers’ compensation: Required for covered employers, bought in the open market. It leaves open a crew member hurt on the job, which Workers’ Compensation answers. Notes: A license, registration or certification is a requirement of the state, not insurance. The conclusion reads: State rules decide who may do the work and how; the policies decide who pays when something goes wrong. No figures are shown.
Idaho coverage, services and state offices
What we insure
Coverage lines
Idaho solar contractor insurance questions
Does the Solar Photovoltaic category on the electrical license mean Idaho has a solar license of its own?
No. The category is a limited category inside the electrical license structure that the Division of Occupational and Professional Licenses administers, and no stand-alone solar license sits outside it. The Idaho Electrical Board’s rule scopes the category to the equipment and wires of photovoltaic systems up to the inverter, or up to the combiner box for micro-inverter systems. Decide before the bid which license each member of the crew holds.
Idaho calls its electrical licensing exclusive to the state. What does that leave a city or county to ask of us?
The statute says no local jurisdiction may require additional licensure or registration for the licenses it covers, so a city cannot add an electrical license of its own. Who inspects is a separate matter, because a city or county that uses the Idaho electrical code as its standard may run its own inspections. Ask the permit office where the job sits what it wants on file.
We already hold an electrical contractor license. Do we also have to register as a contractor?
The registration law does not require registration of persons licensed under the electrical chapter, so an electrical contractor is not asked for the registration on top of the license. The Idaho Contractors Board sits within the Division of Occupational and Professional Licenses. If your firm also builds under public works contracts, that is a separate license with its own rule. Confirm your standing with the licensing division before you rely on the exemption in a bid.
We install for another company that sells to homeowners. Whose registration number lands on the disclosure?
The disclosure statement must carry the state contractor registration number of the person expected to install the system, and the retailer is the one who hands it over. If your firm is excused from registration because of its electrical license, ask the Division of Occupational and Professional Licenses what number belongs on that page before the retailer prints it, and ask to read the page. The attorney general and the district court enforce the Act.
Our ground-mount contract is with a local public body. Does the public works contractor license apply to us?
It can. The public works license reaches construction, repair or reconstruction of a public work for the state or a local public body, and it is needed only when the contract is a public works contract. A private job does not need it. Read the contract documents before you price the job and ask the Division of Occupational and Professional Licenses how the license applies to your firm.
The Legislature created an insurer for workers’ compensation. Is it a state fund our crew has to use?
No. An employer secures compensation with an authorized insurer or with the Idaho Industrial Commission’s approval to self-insure. The statute created the insurer as an independent body corporate politic, to be run as an efficient insurance company, and it is administered without liability on the part of the state. Public employers insure with it unless it refuses the risk. A private solar business treats it as a possible seller among the authorized insurers.
Does Idaho change the rapid shutdown rules for a detached structure that holds only our inverters?
The Idaho Electrical Board’s amendments to the national code include an exemption from the rapid shutdown requirement for detached structures whose sole purpose is to house photovoltaic equipment, and the rule lists further conditions for other buildings. Because those conditions are specific, have the designer read the rule’s text and settle the design with the inspector before the work.
This page describes insurance for solar contractors operating in this state. It is general information, not legal advice and not a statement of coverage. Licensing, interconnection and code requirements change; verify current requirements with the agency named before relying on them.
Get a quote for your Idaho solar contracting business
Tell us whether your Idaho crews install, service or build arrays, whether you hold the electrical license or work under one, and how your crew is paid, and we will build a program around those answers.