Solar Contractor Insurance by State
Michigan Solar Contractor Insurance
Michigan reaches solar work through the electrical license its skilled trades law requires for generating equipment, writes no rule for solar sellers or installers, adopts the electrical code for the whole state and makes workers’ compensation compulsory for covered employers.
Michigan’s only trade license with solar in its name is for heat: a mechanical specialty limited to solar heating and cooling, which does not reach photovoltaic electricity. The license that governs an array’s wiring is the electrical license, because the state’s skilled trades law counts generating equipment as electrical wiring, lets only licensed individuals install it, and bars electrical contracting without a license from the Electrical Administrative Board or from a municipality that licenses at least as strictly. No state law or rule is written for solar sellers or installers, the wiring is built to an electrical code adopted for the whole state, and workers’ compensation is compulsory for covered employers, with no state fund.
That makes Michigan an electrical-license state for solar, though its licensing law never says solar. The sections below follow that reach link by link, then turn to the home builder licenses, the energy law that stops short of the contractor, the code, workers’ compensation and the offices behind each rule.
Policy mechanics that hold in every state live on the solar contractor insurance page. What follows stays with Michigan, quoting the statute and rule text where the words matter and adding advice for an owner whose crews take on rooftop installation, run panel cleaning and maintenance routes or handle ground-mount and solar farm construction.
A top-to-bottom flow that traces how Michigan’s skilled trades law comes to govern the wiring of a solar array although the law never uses the word solar. It begins with the definition: electrical wiring includes generating equipment in or on a building, structure or property. From that definition follows the duty on the person doing the work, because only an individual licensed under the electrical article may install electrical wiring, so the crew works as licensed electricians or as apprentices under the law. The business comes next: it may not contract for electrical work without an electrical contractor’s license from the state’s electrical board or from a municipality whose licensing is at least as strict. Those licenses are then recognized by all municipalities. Last comes the code the work is built to, the national electrical code adopted for the whole state as the Michigan electrical code, with its solar photovoltaic article left as printed. No figures are shown.
Generating equipment inside the definition of electrical wiring
Michigan has no license written for solar installation, but it licenses electrical work statewide under the Skilled Trades Regulation Act, and the Act’s definition of electrical wiring takes in generating equipment in or on a building or property. Only a licensed individual may install that wiring, and a business may not do electrical contracting without an electrical contractor’s license from the Electrical Administrative Board or a municipality whose licensing is at least as strict.
A solar firm that wires arrays in Michigan holds an electrical contractor’s license, and its crew installs the wiring as licensed electricians or apprentices working under the Act. Roof and structural work on homes falls under the Occupational Code’s residential builder and maintenance and alteration contractor licenses, whose printed scope does not name solar or electrical work.
Authority: MCL 339.5701(c), (f); MCL 339.5731(1); MCL 339.5733; MCL 339.5737(1); MCL 339.2401; MCL 339.2404(3); MCL 339.601(1); R 339.5161
The reach starts with a definition. The skilled trades law does not use the word solar, but it describes electrical wiring in terms wide enough to take in an array:
“"Electrical wiring" means all wiring, generating equipment, fixtures, appliances, devices, and appurtenances in connection with the generation, distribution, and utilization of electrical energy, in or on a building, residence, structure, or properties”
The definition speaks of generating equipment in or on a building, structure or property, which is where a rooftop or ground-mount array sits. The solar reach comes from that printed scope rather than from any mention of solar. The same section then defines the business that does this work:
“"Electrical contractor" means a person that is engaged in the business of erecting, installing, altering, repairing, servicing, or maintaining electrical wiring.”
Duties follow from those definitions. The law puts a duty on the person holding the tools:
“Except as otherwise provided in section 737, only an individual who is licensed under this article shall install electrical wiring.”
And it puts another on the business that contracts for the work:
“a person shall not engage in the business of electrical contracting unless the person has received from the board or from the appropriate municipality an electrical contractor's license.”
Read together, the definitions and the duties place a firm that wires arrays in the position of any electrical contractor. As advice, keep a current roster of who on each crew holds which license, and which apprentices work under whom, so a general contractor or an inspector who asks gets an answer the same day.
A municipality may run its own electrical licensing, but the statute ties it to the board’s standard, and licenses that meet the standard travel with the holder:
“A license or registration issued by the board under this article and licenses issued by a municipality that has standards for licensing at least as stringent as those established by the board shall be recognized by all municipalities.”
As advice, when a city has issued a license to someone on your team, confirm that the city’s standards meet the board’s before you lean on that license elsewhere, and keep the confirmation in the job file. A license from the Electrical Administrative Board itself needs no such check.
Licensed hands do not end the exposure. A fire blamed on a connection your electrician made, or a building damaged during the work, lands on general liability, whose page follows those claims from the roof to the finished system.
A solar license written for heat, and the home builder licenses
Michigan does print the word solar in a trade license, but not for electricity. The skilled trades rules list a mechanical specialty limited to solar heating and cooling, and they define its work as installing equipment and systems
“intended to utilize solar energy for space heating or cooling.”
That is solar thermal work, and the specialty does not reach photovoltaic electricity; the wiring of every photovoltaic array still runs through the electrical licenses above. As advice, do not let a mechanical credential stand in for an electrical license on a proposal or a permit application.
Roof and structural work on homes sits under a separate law. The Occupational Code licenses residential builders and residential maintenance and alteration contractors statewide, and it describes the maintenance and alteration contractor as a person who
“Undertakes with another for the repair, alteration, or addition to, subtraction from, improvement of, wrecking of, or demolition of a residential structure, or building of a garage, or laying of concrete on residential property.”
The crafts that license lists name neither solar nor electrical work, and the article reaches residential structures only, so the wiring stays with the skilled trades licenses. The Occupational Code’s general rule bars practice without whatever license it does require:
“A person shall not engage in or attempt to engage in the practice of an occupation regulated under this act or use a title designated in this act unless the person possesses a license or registration issued by the department for the occupation.”
Under the same article, an unlicensed builder or contractor cannot sue to collect for its work. As advice, a firm that does structural work on houses, such as reinforcing a roof frame before an array goes up, should ask the department whether that work brings it under the residential licenses, and settle the answer before the proposal goes out. When a roofer subcontracts the attachment on a home, ask for its residential license along with its certificate of insurance.
What the distributed generation program asks of the installation
Michigan has no state law or rule written for solar sellers or installers. Its distributed generation law, in the Clean and Renewable Energy and Energy Waste Reduction Act, sets the terms on which a utility customer connects a generator and is credited for power, and the only duty it places on the installation is that the equipment meet state and local electric and construction codes.
The Public Service Commission’s interconnection and distributed generation rules run between the utility and the applicant: they ask for diagrams signed by a licensed electrical contractor or professional engineer for some applications, but set no registration, disclosure or contract terms for the business that sells or installs a system.
Authority: MCL 460.1173; R 460.901a to R 460.1026
Michigan has no law or rule written for the business that sells or installs a solar system. The program that does touch an array is a distributed generation program, and its eligibility clause is written about the customer and the utility:
“an electric customer of any class is eligible to interconnect an eligible electric generator with the customer's local electric utility and operate the eligible electric generator in parallel with the distribution system.”
Its only word on the installation itself is a code requirement:
“Distributed generation equipment and its installation shall meet all current local and state electric and construction code requirements.”
The law does not name solar sellers or installers. The Michigan Public Service Commission writes interconnection rules that point the same way, putting the paperwork between the utility and the applicant:
“An electric utility shall provide an interconnection application for an applicant to complete, including for those applicants whose DERs will be configured to be non-exporting.”
The contractor still appears in those rules, as the obligation sentence above records, when an application calls for a diagram signed by a licensed electrical contractor. As advice, treat that signature with the care you give a permit drawing: it puts your electrical contractor’s license on a utility’s file. If a mistake in that file stalls a customer’s connection and costs the customer money, read the professional liability page on interconnection paperwork.
When no state form governs the solar proposal
An absent rule leaves the proposal as the record of what you promised. Nothing in this section is a Michigan requirement; it is advice for the owner whose name goes on the contract.
- The output and savings estimate. Say how it was produced and what it assumes about shading, orientation, equipment and the utility’s credit for exported power. If the array falls short and the customer blames the number, the dispute starts with your page, and the professional liability page sets out how a policy treats an estimate a customer relied on.
- Who holds the license. Name the electrical contractor’s license behind the job and the licensed person who will lead the wiring. A customer who later asks will find the answer in writing.
- The equipment while it is in your hands. If modules and inverters wait at your yard or on site before installation, say who bears a loss until they are in; the tools and equipment page explains how that gear is insured.
- Removal and reinstallation. Spell out what your firm will charge to take the array off for a reroof and put it back, so the question is settled before the roofer arrives.
The national code under a Michigan name
Michigan adopts the National Electrical Code statewide as the Michigan Electrical Code, through the electrical part of the state construction code rules promulgated by the Department of Licensing and Regulatory Affairs under the state construction code act. The adopted code governs the installation, alteration and use of electrical systems, and Michigan’s amendments leave the code’s solar photovoltaic article as printed.
Solar wiring on a Michigan building is installed, permitted and inspected to the Michigan Electrical Code, which applies throughout the state; on houses, the residential code’s own photovoltaic sections also require the panels, inverters and roof penetrations to follow the manufacturer’s instructions and the electrical code.
Authority: R 408.30801; MCL 125.1504; MCL 125.1508a(1); R 408.30536 (Michigan Residential Code E3401)
The construction code statute makes the national electrical code part of the state code and lets the director change it:
“the national electrical code published by the national fire prevention association, with amendments, additions, or deletions as the director determines appropriate.”
The adopting rule names the edition and says what it governs, in a sentence that opens this way
“The standards contained in the national electrical code 2023 second printing edition”
and closes this way:
“as published by the national fire protection association (NFPA), shall govern the installation, replacement, alteration, relocation, and use of electrical systems or material.”
It then gives the adopted code a Michigan name:
“all references to the national electrical code mean the Michigan electrical code.”
And the statute leaves no part of the state outside it:
“This act and the code apply throughout the state.”
Michigan’s amendments leave the solar photovoltaic article as the adopted edition prints it. As advice, note the edition the Bureau of Construction Codes has adopted on every drawing set, so designer, crew and inspector read from the same text, and clear any departure from it with the inspector before the work.
Houses carry an added layer. The residential code has photovoltaic sections of its own, and they send the work back to the manufacturer and to the electrical code:
“The installation, inspection, maintenance, repair, and replacement of photovoltaic systems and all system components shall comply with the manufacturer’s instructions, Sections E3401.6.1 through E3401.6.3 and NFPA 70.”
As advice, keep each module’s and inverter’s installation instructions with the job file, since the residential code makes them part of what the work must follow. A wiring defect that surfaces months after the inspector signs off is a completed-work question for general liability.
Comp for a Michigan crew: a policy, or the director’s approval to self-insure
Workers’ compensation is compulsory in Michigan for the employers its law covers. Each covered employer secures payment of compensation by insuring with an insurer authorized to write workers’ compensation in Michigan, or by authorization from the director of the Workers’ Disability Compensation Agency to self-insure, and the state has no fund that sells coverage.
A solar contractor with employees carries a Michigan workers’ compensation policy from an authorized insurer or qualifies with the agency to self-insure; which private employers the law reaches is set by an employee-count and hours test in the Act itself.
Authority: MCL 418.111; MCL 418.115; MCL 418.611(1)
The Act’s reach opens wide:
“Every employer, public and private, and every employee, unless herein otherwise specifically provided, shall be subject to the provisions of this act and shall be bound thereby.”
Its security section then sets the duty and the routes for meeting it:
“Each employer under this act, subject to the approval of the director, shall secure the payment of compensation under this act by either of the following methods:”
“By insuring against liability with an insurer authorized to transact the business of worker's compensation insurance within this state.”
“By receiving authorization from the director to be a self-insurer.”
Neither route runs through a state fund. For a solar business, that means a policy placed in the private market with an authorized insurer, unless the director has authorized the business to carry the risk itself. The Workers’ Disability Compensation Agency handles workers’ compensation administration, employer compliance and self-insurance authorization.
The Act sets which private employers it covers with a test of its own, built on employees and hours. As advice, do not guess at that line: check it with your agent or the agency as the payroll grows, and have the policy bound before a new hire’s start date. Ask each subcontractor for proof of its own coverage when it signs on, not when its crew is already on the roof. How crews are classified and subcontractors treated at audit is set out on the workers’ compensation page. These findings are Michigan’s alone, and they do not follow a crew across a state line.
Michigan’s Electrical Administrative Board and its Workers’ Disability Compensation Agency are named below. Work at height has its own federal source, the OSHA Fall Prevention Campaign.
The offices that license, adopt the code, regulate utilities and run comp
The Michigan Department of Insurance and Financial Services is the state’s insurance regulator. Before you sign with an insurance agency, ours as much as any other, check its license on NIPR.com.
The rest of the rules on this page sit with these public bodies, each linked to its own page:
- Michigan Department of Licensing and Regulatory Affairs: licenses electrical contractors and electricians and residential builders and maintenance and alteration contractors, and promulgates the state construction code, including the electrical code
- Bureau of Construction Codes: the department’s bureau for the state construction codes, including the Michigan Electrical Code and the skilled trades licenses
- Electrical Administrative Board: the board that licenses electrical contractors and electricians under the Skilled Trades Regulation Act
- Michigan Public Service Commission: utility regulator: the distributed generation program and the interconnection rules, which fall on the customer and the utility
- Workers’ Disability Compensation Agency: workers’ compensation administration, employer compliance and self-insurance authorization
Missing from the list by design: a license written for photovoltaic installers, a regulator for solar sales, and a state workers’ compensation fund. As advice, take electrical license questions to the board and the department, and connection questions to the commission and the customer’s utility.
County lists for Michigan’s metropolitan areas
Each card is a metropolitan area as the U.S. Census Bureau delineates it, with the Michigan counties it takes in.
Detroit-Warren-Dearborn, MI
Its counties: Lapeer County, Livingston County, Macomb County, Oakland County, St. Clair County and Wayne County.
Grand Rapids-Wyoming-Kentwood, MI
Its counties: Barry County, Ionia County, Kent County, Montcalm County and Ottawa County.
Lansing-East Lansing, MI
Its counties: Clinton County, Eaton County and Ingham County.
Flint, MI
Its counties: Genesee County.
Ann Arbor, MI
Its counties: Washtenaw County.
Kalamazoo-Portage, MI
Its counties: Kalamazoo County.
The electrical license is a state license, and a municipal license at the board’s standard is recognized everywhere, so crossing a county line inside a metro does not change which license the statute asks for. As advice, still log the county and municipality of every job you price.
What these Michigan rules mean for the policies you carry
Michigan’s rules decide who may wire an array and how a crew is covered; the policy wording is the same from state to state. Read each line below against the finding that sends you to it:
- Licensed wiring and roof work on homes. A fire, a fault or a leak traced to work your crew did is a general liability question, during the job and after it closes.
- Estimates and signed diagrams. With no state disclosure list, your proposal and the diagrams you sign for a utility carry the risk of an error, which is where professional liability comes in.
- A compulsory comp law with no state fund. The policy from an authorized insurer is explained on the workers’ compensation page.
- Crews driving between jobs. The pickups and trailers that move modules and racking around the state belong on commercial auto.
- Stock waiting to be installed. Inverters, modules and your own meters and lifts fall under tools and equipment.
- Contracts with higher limits. A general contractor or developer asking for more than your primary policies carry is asking about umbrella liability.
The balance among those lines shifts with the kind of work, and the pages on rooftop installation, panel cleaning and maintenance and ground-mount and solar farm construction take each kind separately. A licensed agent can then price the whole program for your Michigan jobs from a quote request.
State rules decide who may do the work and how; the policies decide who pays when something goes wrong.
- A license, registration or certification is a requirement of the state, not insurance.
A panel for Michigan in rows. Each row sets a requirement of the state beside the exposure that requirement leaves open and the coverage line that answers it. License to install: A state electrician license exists; the text read names no solar work. It leaves open damage to the roof, the building or a neighbor’s property from the installation work, which General Liability answers. Solar sales and installer rules: No state rule written for solar sellers or installers. It leaves open a design, sizing or output estimate the customer relied on that turns out wrong, which Professional Liability answers. Electrical code: The state adopts the National Electrical Code statewide. It leaves open a wiring or tie-in fault traced back to the work after the job is done, which General Liability answers. Workers’ compensation: Required for covered employers, bought in the open market. It leaves open a crew member hurt on the job, which Workers’ Compensation answers. Notes: A license, registration or certification is a requirement of the state, not insurance. The conclusion reads: State rules decide who may do the work and how; the policies decide who pays when something goes wrong. No figures are shown.
Michigan coverage, services and state offices
What we insure
Coverage lines
Michigan solar contractor insurance questions
Our company installs photovoltaic systems and nothing else. Is there a Michigan solar license we should apply for?
Not for photovoltaic work. The skilled trades rules hold a mechanical specialty limited to solar heating and cooling, which is thermal work and does not reach an array’s electricity. What reaches your arrays is the electrical license: the law counts generating equipment as electrical wiring, so the business needs an electrical contractor’s license from the Electrical Administrative Board or a municipality licensing at least as strictly, and the crew installs as licensed individuals.
A city we work in issues its own electrical licenses. Will a license from that city be honored in the next town over?
The statute says licenses from the Electrical Administrative Board, and licenses from a municipality whose standards are at least as stringent as the board’s, are recognized by all municipalities. A city license below that standard gets no such promise. As advice, ask the city which standard its license meets before you rely on it outside the city, and keep the answer in writing in the job file.
Our roofers mount the racking on houses. Does a residential builder license let them handle the electrical side too?
No. The Occupational Code licenses residential builders and maintenance and alteration contractors, but the crafts that license lists name neither solar nor electrical work, and electrical wiring stays with the skilled trades licenses. As advice, keep the roof attachment and the wiring in separate lines of the proposal, name who holds the electrical license, and collect each subcontractor’s license with its certificate of insurance.
Does Michigan set rules for how we sell, lease or finance a home solar system?
No state law or rule is written for solar sellers or installers. The distributed generation law sets the terms on which a utility customer connects and is credited, it does not name solar sellers or installers, and the Michigan Public Service Commission’s rules set no registration, disclosure or contract terms for the business that sells or installs a system. As advice, let your own proposal carry the explanations a customer will later point to.
Has Michigan changed the solar article of the electrical code our designers work from?
No. Michigan adopts the national electrical code for the whole state under its own name, and its amendments leave the solar photovoltaic article as the adopted edition prints it. On houses, the residential code adds photovoltaic sections that require the panels, inverters and roof penetrations to follow the manufacturer’s instructions and the electrical code. As advice, keep each product’s installation manual with the job file for the inspector.
Our crew is growing. What are our options for meeting Michigan’s workers’ compensation law?
A covered employer secures compensation by insuring with an insurer authorized to write workers’ compensation in Michigan, or by authorization from the director to self-insure. The state has no fund that sells coverage. Which private employers the law reaches turns on an employee and hours test in the Act, so as advice, check it with the Workers’ Disability Compensation Agency or your agent before the next hire starts work.
We prepare interconnection paperwork for our customers. Who sets those rules, and what do they ask of us?
The Michigan Public Service Commission sets the interconnection and distributed generation rules, and they run between the utility and the applicant. For some applications they ask for diagrams signed by a licensed electrical contractor or a professional engineer. As advice, check every diagram and form before it goes in, keep a copy of each submission, and remember that the signature on a diagram puts your license on the record.
This page describes insurance for solar contractors operating in this state. It is general information, not legal advice and not a statement of coverage. Licensing, interconnection and code requirements change; verify current requirements with the agency named before relying on them.
Get a quote for your Michigan solar contracting business
Share whose name is on your electrical contractor’s license, whether you build on houses, businesses or open ground, and where in Michigan your crews travel, and we will shape a program around it.