Solar Contractor Insurance by State
Maryland Solar Contractor Insurance
Maryland licenses solar wiring through electrician licenses that the State issues or a county registers, licenses work on houses through the home improvement commission, puts duties on the contract, the filing and the lockout tag, leaves the code edition unconfirmed, and makes workers’ compensation compulsory.
No solar-specific license appears in the Maryland statutes cited below, so a solar contractor works under the licenses the statutes already provide: electrician licenses from the Maryland State Board of Electricians, which a county or municipality may stand in for with a local registration, and, on work at a residence, the contractor license of the Maryland Home Improvement Commission. The statutes also put duties on the business that installs a customer’s system: a wildlife barrier term in a rooftop contract, an interconnection application filed before installation begins, and a lockout tag at each residential installation. Which edition of the National Electrical Code governs the wiring is not confirmed. Workers’ compensation is compulsory, and the insurer the statute created for it is a private, nonprofit, nonstock corporation, not a state fund.
Each finding has a boundary. The home improvement license is defined by residential use, and whether commercial buildings and solar farms need another state contractor credential is not confirmed. The statutory duties bind the contract, the filing and the tag, yet they build no registration regime for solar sellers. The sections below take each finding in turn, with the source’s own words where they matter and advice for the owner.
How the policies themselves work for a solar business anywhere is laid out on the solar contractor insurance page and the coverage pages it links to. This page keeps to what is particular to Maryland, whether your business does rooftop installation, runs panel cleaning and maintenance routes or takes on ground-mount and solar farm construction.
A flow down a rooftop job on a house. It begins with the Home Improvement Commission contractor license, held for the mounting and the sale on work at a residence. Next, the home improvement contract carries a wildlife barrier term unless the customer waives it after being told its cost and the risk. Then the installer files the interconnection application before beginning installation, and refunds any payment if it is denied. The wiring follows, done by an electrician holding a State Board of Electricians license or a local registration. The lockout tag goes on at each residential installation at the time of installation. The last step is the crew’s compulsory workers’ compensation, met through an authorized insurer, a self-insurance group or approved self-insurance, with no state fund. No figures are shown.
A State license for the electrician, or a local registration in its place
No solar-specific license appears in the Maryland statute text. The State Board of Electricians’ words read name no solar work, and solar wiring falls under electrician licensing: the Board issues the master, journeyperson and apprentice licenses, and a county or municipality may register electricians locally instead of requiring the State license. For work on homes, the Maryland Home Improvement Commission licenses the contractors and salespeople, and the Commission’s guidance, which is not a rule of the Board of Electricians, puts the mounting of solar panels inside the home improvement license.
Authority: Bus. Occ. & Prof. §§ 6–101, 6–301, 6–302; Bus. Reg. §§ 8–101, 8–102, 8–301, 8–501(f)
The licensing question for the wiring starts with what the statute counts as electrical services. The definition does not use the word solar. It speaks of equipment that generates electrical energy, language that on its face takes in the wiring of an array:
“includes installing, repairing, maintaining, erecting, or altering any electrical equipment, wiring, fixture, appliance, apparatus, raceway, conduit, or system that: (i) generates, transmits, transforms, or uses electrical energy in any form for light, heat, power, or communication”
The Maryland State Board of Electricians licenses master electricians, journeyperson electricians and apprentices; the State license is the route to a local registration where a jurisdiction registers locally. The statute leaves each county and municipal corporation a choice between registering electricians under its own regulations and requiring the State license, and it says what the State license does in a place that has not required local registration:
“If a county or municipal corporation does not require local registration, the State license, while the State license is in effect, authorizes the licensee to: (1) provide electrical services”
An electrician on a Maryland array therefore holds either a State license or a local registration, depending on the place. As advice, treat that as a question for each jurisdiction rather than a fact about the state, and settle it while the job is still being priced.
- Ask the county or municipal office where the job sits whether it registers electricians itself or requires the State license, and what it wants on file before a permit issues.
- When you subcontract the tie-in, ask the electrician for the license or registration with the certificate of insurance, and write the credential into the subcontract. A registration good in the county where your shop sits says nothing about the town across the county line.
How a liability policy treats the electricians you hire, and damage your crews cause on a roof or in a building, is set out on the general liability page.
A home improvement license defined by the house, and the work it leaves unconfirmed
Work on a residence belongs to the Maryland Home Improvement Commission, which licenses home improvement contractors and salespeople and publishes guidance on which green-technology work needs its license. Its statute states the duty to hold a license this way:
“a person must have a contractor license whenever the person acts as a contractor in the State.”
What counts as a home improvement is set by the building, not by the trade. The definition reaches work on
“the addition to or alteration, conversion, improvement, modernization, remodeling, repair, or replacement of a building or part of a building that is used or designed to be used as a residence or dwelling place or a structure adjacent to that building”
The Commission publishes guidance on green technology that applies the definition to solar. Its words are agency guidance, not the statute, but they leave no doubt about where the mounting falls:
“Solar panel systems must be mounted by a licensed home improvement contractor, regardless of whether the system is attached to the roof or other part of the house, or attached to the land adjacent to the house.”
A solar contractor working on homes in Maryland holds a Home Improvement Commission contractor license for the mounting and the sale, and has the wiring done by electricians licensed by the State Board of Electricians or registered with the local board. The home improvement license is defined by residential use; whether commercial buildings and solar farms need another state contractor credential is not confirmed here, and the electrician rules apply to that work as they do to rooftop work.
The statutory sections cited above contain no solar-specific license, and whether an act of the General Assembly has written a solar license into them is not confirmed. As advice, sort every job by building type before the bid. For a house, plan on the contractor license and the electrician together. For a warehouse roof or a ground-mount field, put the credential question to the Commission in writing and keep the reply in the job file, because silence is not permission.
A wildlife barrier term, an interconnection filing and a lockout tag
Maryland has no registration or licensing regime written for solar sellers, but its statutes put duties on the business that sells or installs a customer’s system: a home improvement contract for a rooftop solar system must include a wildlife barrier unless the customer waives it after being told its cost and the risk, a person negotiating to install a solar generating facility must apply for utility interconnection approval before beginning installation and refund any payment if it is denied, and a company installing residential solar must put a lockout tag on the disconnect switch box.
Authority: Bus. Reg. § 8–501(f); Pub. Util. § 7–306.1; Pub. Safety § 12–705
The contract term sits in the home improvement title. It says that
“a home improvement contract for the installation of a solar energy generating system on the roof of a building shall include the installation of a barrier that meets industry standards to prevent wildlife intrusion”
The statute lets the customer decline, but only on informed terms. The barrier is not required
“if the customer has waived the installation of the barrier after being informed of the cost of the barrier and the risks of not installing a wildlife barrier”
The interconnection duty lives in the public utilities title and is written for the installer who is still negotiating. It opens by naming who is bound, and then limits when the work may begin:
“A person who is negotiating a contract with an eligible customer–generator to install a solar electric generating facility on the customer–generator’s property”
“may not begin installation of the solar electric generating facility on the customer–generator’s property”
The limit applies before the electric company approves the interconnection application, and the duty that completes the sequence is a refund of any payment if the application is denied. The Maryland Public Service Commission is the utility regulator; its regulations set the process and time frame for the electric company’s interconnection decision that a solar installer’s application starts. Net metering and community solar rules bind the electric company and the customer-generator, so they are not counted among the installer duties on this page.
The lockout tag belongs to the public safety title, and its sentence is short:
“A company that installs solar photovoltaic systems shall install a lockout tag at each residential installation at the time of installation.”
The interconnection duty is written for a customer-generator of any kind, while the contract term and the lockout tag are written for residential work. These duties are terms and steps, not a registration or a license: a business either completes them or cannot show that it did.
Writing the contract, the filing and the close-out around those duties
Nothing in this section is a rule the state has adopted; it is advice for the owner whose name is on the proposal.
- The barrier clause. Put the barrier into every rooftop contract on a house and price it as its own line. If a customer waives it, the waiver should show what the customer was told about the cost and the risk, in words the customer signed. The general liability page explains how a liability policy treats damage your crew causes to a roof.
- The filing before the work. Treat the interconnection application as a gate in the schedule, not a task for the week the crew shows up, and decide in advance how a payment you have taken would be returned if the application is denied. The professional liability page explains how a policy treats a paperwork error that holds a project up.
- The tag at close-out. Make the lockout tag a line on the crew lead’s checklist for every residential system, signed off with the date, so that proof of the tag exists before anyone asks for it.
The fire code route to the national electrical code, and an edition not confirmed
Solar wiring in Maryland is built to the National Electrical Code as the State Fire Prevention Commission adopts it and as the local jurisdiction adopts it. Which edition applies is not confirmed here from the adopting rule’s own words.
Authority: Pub. Safety § 12–702(a); Code of Maryland Regulations title 29, subtitle 06, chapter 01
The Department of Labor’s table of adopted codes lists the routes to an electrical code for buildings other than modular and State-owned ones. The local route is printed as a row of its own:
“Electrical (3) local jurisdiction (locally adopted)”
The statewide route runs through the State Fire Prevention Commission. The Public Safety Article defines the code for its own section by reference to what that Commission adopts, and the definition serves that section’s subject, not a general adoption of the electrical code:
“means the most recent edition of the National Electrical Code adopted by the Commission.”
The Office of the State Fire Marshal enforces the State Fire Prevention Code, which the Department of Labor’s code table lists as a National Electrical Code route. The local side is whatever each jurisdiction has adopted. Because the table lists the State Fire Marshal route and the local route for the same kind of building, the edition in force can depend on the building and on the place, and this page states no edition.
As advice, ask the permitting office where the job sits, in writing, which edition of the National Electrical Code it applies to a solar installation and whether the State Fire Marshal or the local building office inspects the wiring, and have the designer mark the answer on the drawings so that the conductor sizing, the labeling and the equipment all follow the same edition. How a liability policy treats a fault in finished wiring that comes to light after the job is explained on the general liability page.
Compulsory comp, and a statute-made insurer that is a corporation
Workers’ compensation is compulsory in Maryland: each employer secures compensation by insuring with an authorized insurer, by joining a governmental or private self-insurance group, or by self-insuring to the satisfaction of the State Workers’ Compensation Commission. The state’s own insurer was converted by statute into a private, nonprofit, nonstock corporation that competes with other insurers; it is a corporation, not a government fund.
Authority: Lab. & Empl. § 9–402(a); Lab. & Empl. § 9–405(a); Ins. §§ 24–303, 24–304, 24–309
The Labor and Employment Article states the duty and the insurance route together:
“each employer shall secure compensation for all covered employees of the employer by: (1) maintaining insurance with an authorized insurer;”
The sentence goes on to list a governmental self-insurance group, a group of private employers and individual self-insurance. An employer that chooses the individual route has to satisfy the State Workers’ Compensation Commission, which administers the workers’ compensation law, including approval of self-insurers and self-insurance groups:
“Each employer who wants to self–insure under this section shall satisfy the Commission that the employer is financially able to pay compensation.”
The statute also gives the state’s own insurer a corporate form. The subtitle that creates it says the insurer shall be
“a private, nonprofit, nonstock corporation organized under State law”
Its status relative to the government is stated just as directly. The Insurance Article says the insurer
“is not and may not be deemed to be a department, unit, agency, or instrumentality of the State for any purpose.”
For a solar business, that leaves a market. An employer with covered employees insures with an authorized insurer, which includes the statute-created corporation, joins an approved self-insurance group, or qualifies with the Commission to self-insure. No state fund sells the policy. How crews are classified, how subcontractors are treated at audit and how a policy follows a crew that travels are set out on the workers’ compensation page. As advice, settle before the season who on each job is your employee, ask your agent which insurers are quoting, and collect a certificate from every subcontractor before its people set foot on an array. Nothing on this page reaches past Maryland’s border.
Maryland’s State Board of Electricians and State Workers’ Compensation Commission appear below. For employers who put a crew on a roof, OSHA’s Fall Prevention Campaign covers the planning, equipment and training side.
Who to call at the commission, the board and the marshal’s office
The Maryland Insurance Administration is the state’s insurance regulator; examines and regulates the statute-created insurer in the same manner as other property and casualty insurers. Any agency that sells you a policy, this agency among them, can be looked up on NIPR.com.
The other public bodies behind this page each hold a separate part of the picture. Each link goes to the body’s own site or to the statute it works under, and each role is stated in the body’s own terms:
- Maryland State Board of Electricians: licenses master electricians, journeyperson electricians and apprentices; the State license is the route to a local registration where a jurisdiction registers locally
- Maryland Home Improvement Commission: licenses home improvement contractors and salespeople and publishes guidance on which green-technology work needs its license
- State Workers’ Compensation Commission: administers the workers’ compensation law, including approval of self-insurers and self-insurance groups
- Maryland Public Service Commission: utility regulator; its regulations set the process and time frame for the electric company’s interconnection decision that a solar installer’s application starts
- Office of the State Fire Marshal: enforces the State Fire Prevention Code, which the Department of Labor’s code table lists as a National Electrical Code route
The Board, the Commission and the Marshal answer different questions, and the permitting office of the county or municipality where the job sits answers whether it registers electricians or requires the State license. Match the question to the office before you call.
Counties behind the metro cards, and a metro whose principal city lies elsewhere
The cards below show the largest metropolitan areas with a principal city in Maryland, as the U.S. Census Bureau delineates them, and the Maryland counties inside each. The last card is a metro whose principal city lies outside Maryland; it appears because a Maryland county is part of it.
Washington-Arlington-Alexandria, DC-VA-MD-WV
Part of this metro lies outside Maryland; this card lists its Maryland counties only: Frederick County, Montgomery County, Charles County and Prince George's County.
Baltimore-Columbia-Towson, MD
Made up of Anne Arundel County, Baltimore County, Carroll County, Harford County, Howard County, Queen Anne's County and Baltimore city.
Hagerstown-Martinsburg, MD-WV
Part of this metro lies outside Maryland; this card lists its Maryland counties only: Washington County.
Lexington Park, MD
Made up of Calvert County and St. Mary's County.
Salisbury, MD
Made up of Somerset County and Wicomico County.
Philadelphia-Camden-Wilmington, PA-NJ-DE-MD
Part of this metro lies outside Maryland; this card lists its Maryland counties only: Cecil County.
Because each county and municipal corporation chooses between registering electricians and requiring the State license, a metro area is a set of jurisdictions that can each answer the question differently. As advice, log the county and the city for every job you price, check that place’s answer before the proposal goes out, and do not assume that a registration good in a metro’s principal city carries into its suburbs.
From the license, the filing and the tag to the policy pages
The findings above say where Maryland’s rules sit. The policies that answer for the work are the ones a solar business carries wherever it works, and each has its own page:
- The electricians you bring in and the barrier on a rooftop contract point to general liability, which also takes up finished wiring and damage to the roof or building under the array.
- The interconnection filing and the estimates a customer relied on point to professional liability.
- The compulsory comp law points to workers’ compensation, placed with an authorized insurer, a self-insurance group or an approved self-insurer.
- Trucks and trailers that carry modules, racking and lockout tags between the yard and the job point to commercial auto, and your own gear on the way to the roof to tools and equipment.
- Contracts that ask for limits above the primary layer point to umbrella liability.
Which of those weigh heaviest depends on the work, and the pages on rooftop installation, panel cleaning and maintenance and ground-mount and solar farm construction take each kind of work on its own terms. When you are ready to put the pieces together for Maryland jobs, a quote request is the place to start.
State rules decide who may do the work and how; the policies decide who pays when something goes wrong.
- A license, registration or certification is a requirement of the state, not insurance.
- Electrical code is not confirmed at the state level on this page.
A panel for Maryland in rows. Each row sets a requirement of the state beside the exposure that requirement leaves open and the coverage line that answers it. License to install: A home improvement contractor license reaches solar mounting, by Commission guidance. It leaves open damage to the roof, the building or a neighbor’s property from the installation work, which General Liability answers. Solar sales and installer rules: The state sets its own rules for solar sellers, installers or providers. It leaves open a design, sizing or output estimate the customer relied on that turns out wrong, which Professional Liability answers. Electrical code: Not confirmed at the state level. No connector is drawn for this row. Workers’ compensation: Required for covered employers, bought in the open market. It leaves open a crew member hurt on the job, which Workers’ Compensation answers. Notes: A license, registration or certification is a requirement of the state, not insurance. Electrical code is not confirmed at the state level on this page. The conclusion reads: State rules decide who may do the work and how; the policies decide who pays when something goes wrong. No figures are shown.
Nearby states we also write
Maryland coverage, services and state offices
What we insure
Coverage lines
Maryland solar contractor insurance questions
Our crew mounts panels on houses and a hired electrician makes the connection. Which Maryland license do we hold?
The Maryland Home Improvement Commission licenses the contractor who mounts and sells, and its guidance puts the mounting of solar panels on homes inside that license. The wiring goes to an electrician licensed by the Maryland State Board of Electricians or registered with the local board. Hold the contractor license yourself, name the electrician and the kind of license on the proposal, and keep the certificate of insurance in the job file.
Our county registers its own electricians. Does a State license still count on a job there?
That depends on the county. The statute has each county and municipal corporation either register electricians under its own regulations or require the State license, and where it does not require local registration, the State license authorizes the licensee to provide electrical services. Ask the county office which route it uses before the bid, and write the answer into the proposal.
We build on warehouse roofs and open ground as well as houses. Does a different Maryland credential apply there?
That is not confirmed. The home improvement license is defined by residential use, and whether commercial buildings and solar farms need another state contractor credential is not confirmed. The electrician rules apply to that work as they do to rooftop work on houses. Before you bid a larger building or a ground-mount site, put the question to the Maryland Home Improvement Commission and to the permitting office, and keep the answers in writing.
A homeowner wants the wildlife barrier left off a rooftop contract. What does the statute allow?
A home improvement contract for a rooftop solar system must include the barrier, unless the customer has waived it after being informed of the barrier’s cost and the risks of not installing a barrier. The waiver therefore depends on what the customer was told. Put the cost and the risks in writing, have the customer sign the waiver, and keep it with the contract.
Does the interconnection duty fall on us as the installer, and what happens to a payment if the application is denied?
The statute reaches a person negotiating a contract with an eligible customer-generator to install a facility, which includes the installer. That person must apply for interconnection approval before beginning installation and refund any payment if the application is denied. The Maryland Public Service Commission is the state’s utility regulator; its regulations set the process and time frame for the electric company’s interconnection decision that a solar installer’s application starts. Build the filing into the schedule.
What does the lockout tag rule ask of a company that installs residential solar?
The company installs a lockout tag at each residential installation at the time of installation, on the disconnect switch box. Add the tag to the crew’s close-out checklist, with a photograph if your process allows it, so that no residential system leaves the job without it and your files show which crew member installed the tag.
Our agent says Maryland’s workers’ compensation insurer is not part of the government. Is that right?
The statute that creates it makes it a private, nonprofit, nonstock corporation and says it is not and may not be deemed a department, unit, agency or instrumentality of the State. It sits among the authorized insurers an employer may choose. An employer may instead join a self-insurance group or self-insure to the satisfaction of the State Workers’ Compensation Commission. Ask your agent which insurers are quoting your crew.
Our inspector cites an edition of the electrical code that we cannot find in any state rule. What should the crew do?
The edition is not confirmed at the state level: the State Fire Prevention Code and local adoption are the routes, and the Office of the State Fire Marshal enforces the State Fire Prevention Code, which the Department of Labor’s code table lists as a National Electrical Code route. Ask the permitting office in writing which edition it applies, ask the inspector for the adopting instrument, and have your designer note the answer on the plans.
This page describes insurance for solar contractors operating in this state. It is general information, not legal advice and not a statement of coverage. Licensing, interconnection and code requirements change; verify current requirements with the agency named before relying on them.
Get a quote for your Maryland solar contracting business
Tell us whether your Maryland jobs are houses or larger buildings, who holds the electrician license on your crew, and how your crew is paid, and we will build a program around those answers.